Southtowns Record

SUPPORTING DOCUMENTS 2B-5H

Government
Town of Aurora
Board
Town Board
Meeting
Aug 10, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Roads and traffic, Audits and oversight, Parks and recreation, Energy and data center siting

Original document

Same meeting

Text · page 79 of 81

Read the whole document on one page (all 81 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Proposal Subject to:
  e  =Ability of equipment to maneuver in and around perimeter of building safely
  e  Site and a 20 foot perimeter of the site being level, compacted and drained so equipment can
  operate safely and effectively
  e  No electrical, gas or water lines to be worked around. They must be clearly labeled.

Not Included in the Above Estimate
  -@  Taxes (we would require a tax-exempt certificate)
  e  Associated fees or permits
  Site work/excavation
  Bonding
  Electrical and Heating requirements
  Building pad and stone, drainage
  Paving of salt storage building
  Engineering Calculations Package (in building proposal)
  e  Excavation of footers (we look to the town to assist with this task)

Due to the potential for changes in tariffs and trade regulations, the prices quoted in this contract are
subject to adjustment. If there are any increases or decreases in tariffs that affect the cost of materials or
services, the contractor reserves the right to modify the contract price accordingly. Any adjustments will
be communicated in writing and agreed upon by both parties prior to implementation.

All of our buildings are Hot Dipped Galvanized, Post Fabrication.  This means you have the full protection
of HDG, inside and out, welds and all; nothing is exposed.  Every building sold by Calhoun Super
Structures is individually run through a 3D Finite Element Analysis using all the site and building specific
information by 3 Party Engineers. This process allows us to see the amount of stress your building is
under, anywhere on the structure, down to the size of a pin head. This type of engineering is the only
true way to see how your building will perform in a 100 or 500-year storm. The building comes with a
25-year Warranty.

Our building meets all OGS salt storage requirements.

Thank you for this opportunity to provide you with a proposal.  Please call us once you have had an
opportunity to review it.