Text · page 15 of 54
Read the whole document on one page (all 54 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
rules or regulations. K. Additional standards or requirements that the Town Board may reasonably request. (1) The proposed use must not destroy or adversely impact significant historic and/or cultural resource sites. § 116-45. Recording of special use permit. A. Upon issuance of a special use permit, a copy of the permit form and a certified copy of the resolution shall be delivered to the applicant, who shall, with 30 days of such delivery, return the completed form to the Town Clerk for official signature. The special use permit so granted by the Town Board shall be recorded, or a memorandum of such permit signed by a Town official shall be recorded, by the applicant, in the office of the Clerk of the County of Erie. Such documents shall be in a form acceptable for filing and shall make reference to the liber and page of the deed granting ownership of the affected premises to the current owner. B. Proof of such filing shall be received by the Town of Aurora Town Clerk. (1) A certificate of occupancy to the applicant will not be issued until proof of filing is received. (2) Failure to provide proof of filing within 10 days thereafter shall render void the special use permit so granted. § 116-46. Review of special use permit. Upon reasonable notice to the applicant, the Code Enforcement Officer or his designee has the authority to conduct a site visit. The purpose of said site visit is to ensure that the use is being operated in accordance with this chapter and the conditions specified by the Town Board. If the Code Enforcement Officer or his designee determines that a violation of this chapter or of the special use permit conditions exists, the revocation procedures of § 116-49 of this chapter shall be invoked. Refusal to allow an inspection shall be considered grounds for revocation. § 116-47. Expansion of special use permit. The nature, duration and intensity of the operations which are involved in or conducted in connection with any use for which a special use permit has been granted shall not be increased or expanded without the approval of the Town Board. Any expansion of a previously approved special use permit shall be treated as a new application. § 116-48. Expiration of special use permit. A.A special use permit shall expire if meaningful construction has not been commenced within one year, and has not been completed within two years, of final special permit approval or, ifno construction is involved, if the use has not been commenced within one year of final special use permit approval. B. Said permit shall expire if the special use, once begun, ceases operation, for any reason, for more than six consecutive months. For seasonal uses, the use will be considered ceased if there is no operation for at least 12 consecutive months. C. Said permit shall expire if the ownership of the property changes (if the applicant was the