Pine Street and Girard Avenue Intersection All-Way Stop

Barton & Loguidice, D.P.C. (B&L) is pleased to provide this scope and fee proposal for
services related to the Pine Street and Girard Avenue Intersection.

The professional services to be provided by B&L are as follows:

  1) Third party review of all-way stop recommendation – B&L will review the all-way
  stop analysis and recommendation made by Erie County for the Pine Street and
  Girard Avenue intersection. This review will include a review of the data,
  assumptions, analysis, and recommendation for an all-way stop. B&L will verify the
  sight distance measurements and design intersection sight distance values in the
  study are compliant with guidance from AASHTO’s A Policy on Geometric Design of
  Highways and Streets, 2018 and the 11th Edition of the National Manual on Uniform
  Tra ic Control Devices (MUTCD).

  2) Queue Analysis – B&L will model peak-hour queue lengths at the intersection using
  Synchro Sim Tra ic or similar modeling software. The queue analysis will
  specifically identify queue lengths on Pine Street relative to the adjacent
  intersection with Lawrence Avenue.

  3) Vehicle Turn Templates – B&L will model turn templates for the school bus (S-Bus
  40) and delivery truck (SU) design vehicles from Girard Avenue onto Pine Street and
  Lawrence Avenue onto Pine Street. Turn templates will be provided on aerial
  imagery.

  4) Technical Memorandum – B&L will document the findings from Tasks 1 through 3
  above into a Technical Memorandum and establish a third-party professional
  opinion on the County’s recommendation for an all-way stop at the subject
  intersection.

  Exclusions: This scope of work does not include survey/mapping, conceptual
  design, an analysis of speed reduction alternatives, cost estimates, bid documents,
  or environmental review.