Southtowns Record

PBA03.12.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Mar 12, 2026, 6:00 p.m.
Posted by publisher
Feb 25, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Roads and traffic, Zoning and land use

Original document

Same meeting

Text · page 14 of 65

Read the whole document on one page (all 65 pages, each with its own heading)

sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor
to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration.
All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145

  Greensboro
  Utica
  Buffalo
  8

  0.25

  Proposed Bank
  0.5

  1
  PROPOSED
  SINGLE-STORY BANK  S1

  2.5
  0.1
  EXISTING 2-STORY

  0.1
  2.5
  2,750± S.F.  S1
  F.F.E. = 530.40  OFFICE BUILDING

  0.5
  3,150 S.F. FOOTPRINT

  1
  FIXTURE ONLY - INSTALL  F.F.E. = 530.90

  0.25
  ON EX. LIGHT POLE
  © CARMINA WOOD DESIGN

  West Seneca, NY
  1465 Union Road
  1
  0.

  5
  0.  25
  0.
  S1  1

  STOP
  5
  2.

  NOTE: LIGHT POLES TO MATCH EXISTING.

  5
  2.
  ALL SITE LIGHTING SHALL BE DARK SKY
  S1  COMPLIANT AND MOUNTED AT 15-FT

  1

  1
  5

  0.
  0.
  0.
  25
  STOP

  Date
  S1  DO NOT
  ENTER
  2.5

  Site Lights

  No. Description
  1  Parking Lot Lights (S1) - Gardco

  REVISIONS:
  0.5  ECF-4-75LA-4853-NW-IS Pole mt @ 15'
  0.25
  0.1

  15

  ARY
  CTION
  CONSTRU
  PRELIMIN
  POTENTIAL FUTURE
  PARKING EXPANSION

  NOT FOR
  DRAWING NAME:

  Lighting Plan

  Date:  1/20/26
  Drawn By:  A. Pandolfe

  Lighting Plan  NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS,
  Scale:
  DRAWING NO.
  As Noted

  CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
  SCALE: 1"=30'
  20'
  20  0  20  40Ft.

  LP-100
  Project No:  25-4181

  Page 14 of 65