25-4181 storm calcs - proposed  Type II 24-hr 1-Year Rainfall=1.87"
Prepared by Carmina Wood Design  Printed 2/11/2026
HydroCAD® 10.20-8a s/n 05019 © 2025 HydroCAD Software Solutions LLC  Page 8

  Summary for Subcatchment 2S: Proposed Site

[47] Hint: Peak is 126% of capacity of segment #3

Runoff  =  2.00 cfs @ 11.99 hrs, Volume=  4,350 cf, Depth= 0.98"
  Routed to Pond 3P : Underground Detention

Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.50-70.02 hrs, dt= 0.04 hrs
Type II 24-hr 1-Year Rainfall=1.87"

  Area (sf)  CN  Description
  5,900  98  Roofs, HSG D
  20,800  98  Paved parking, HSG D
*  1,604  98  Sidewalks
  24,735  80  >75% Grass cover, Good, HSG D
  53,039  90  Weighted Average
  24,735  46.64% Pervious Area
  28,304  53.36% Impervious Area

  Tc Length Slope Velocity Capacity Description
  (min) (feet)  (ft/ft) (ft/sec) (cfs)
  4.3  27 0.0400  0.10  Sheet Flow,
  Grass: Dense n= 0.240 P2= 2.50"
  0.6  34 0.0210  1.00  Sheet Flow,
  Smooth surfaces n= 0.011 P2= 2.50"
  2.5  307 0.0020  2.03 1.59 Pipe Channel,
  12.0" Round Area= 0.8 sf Perim= 3.1' r= 0.25'
  n= 0.013 Corrugated PE, smooth interior
  7.4  368 Total