Text · page 4 of 12
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
« Other agencies, as applicable 6. The applicant may be required to submit revised plans, reports or materials to address review agency comments. 7. After the review process, a public hearing will be held before the Town Board. 8. Afinal determination will be made by the Town Board per the requirements of the Zoning Ordinance. Checklist for conceptual development plan: 1. Description of atl land which the applicant proposes to develop as well as all lands owned by the applicant adjacent to the area proposed and a copy of the recorded Deed of the applicant describing the subject premises. 2. The location of property with respect to surrounding property and streets. 3. The location and approximate dimensions of all existing property lines. 4. All pertinent features, such as existing structures, streets and other information that may influence the design of the plan. 5. The location, width, and approximate grade of all proposed access roadways. 6. The approximate location, dimensions, and area of all proposed or existing lots. 7. The names of all property owners or records adjacent to and abutting the proposed open development area. 8. The name and address of the owner(s) of the land to be developed, the name and address of the developer(s), if other than the owner, and the name of the land surveyor. 9. The acreage of the tract to be developed to the nearest 1/10 of an acre. 10. Any other appropriate information. 11. Specifications for a private right-of-way and a plan for maintenance.