Village of Gowanda Summary of Water System Preliminary Engineer's Report - Project Status Update January 13, 2026 - Town Board Meeting Prepared: January 6, 2026 25310 - (V) Gowanda Water System Preliminary Engineer's Report e Site Visits and Meetings: 10/20/25 - Project Kickoff Meeting with Village 0 10/28/25 - Initial Site Visit with Water Dept. (springs, reservoir, treatment) oa0 11/14/25 ~ Site Visit with Kirk (well and well house) 12/05/25 - Review Distribution System and Basemapping with Mark Burr ® The 1.7 million gallon finished water storage tank (clearwell) located on Crestwood Drive was inspected by a professional tank inspection company on 12/8/2025. Results will be shared with the Village immediately upon receiving the report from Atlantic Underwater Services. A brief overview of the inspection when on site: o Tank concrete structure is generally satisfactory in condition Roughly 1” of sediment in bottom 0 Roof structure is in poor condition and does not meet current standards 00 Drain and overflow do not meet current standards Inlet/outlet piping will likely need to be reconfigured oaoa Current configuration does not appear to accommodate effective operation of the system if the tank needs to be taken out of service (such as for maintenance) o Some existing valving is generally aged and may not be considered reliable should the tank need to be isolated or drained. ' e ‘Task 1: Engineering Study and Report o Weare continuing to confirm the goals and concerns of the Village as the project progresses. o We have gathered a considerable number of existing reports, drawings and records from various sources with Mark Burr and the Village water staff being a tremendous resource. All documents received have been digitized and organized electronically for the Village’s use when the project is completed. * Note thatno drawings for the 1.7 million gallon finished storage tank have been found at this time, the tank was built in 1936. Village water staff continue to search through their records forany drawings that may pertain to the tank and associated tank inlet/outlet piping. © Several site visits have been completed and existing records analyzed allowing our team to have a better understanding of the existing water system. This process is ongoing as we continue to learn about the system and gain information on outstanding questions we have. o Weare currently assessing the system issues and deficiencies according to current standards «Tank roof structure is in poor condition * Coke aeration filter is in deplorable condition (CCHD 2024 Sanitary Survey) * Reservoir source site security ® Layne Wellhouse is in very poor condition File: 25310 lof2