Gowanda Water Department MONTHLY BOARD REPORT Gowanda- Processed 11,611,100 gallons for the month of February for a daily average of 414,500 gallons. 10 Ufpo. Processed 10 work orders. Plowed water stuff. Spent a lot of time searching for leaks. Found a few house leaks. Had 2 frozen water lines on buffalo St. Attempted to unthaw the one no luck. Hose bib both of those ones. Had 3 frozen water lines on west main St. Successful unthawed one attempted the other with no luck. Hose bib 2 places. Frozen water line on walnut St. No luck unthawing, ended up having to hose bib them. Call in Gallman to fix leak on Dawson drive. Very busy and hectic month for us with all the different leaks in both Gowanda and Collins along with the frozen service lines in Gowanda. Collins 1- Processed 2,039,000 gallons for a daily average of 72,800 gallons. 8 Ufpo. Processed 2 work orders. Lot of plowing. Had a leak on quaker st at a bel! joint. Had Gallman fix that leak. Had a leak on rt 39 at a bell joint had Northrup fix that leak. Shut off a leaking house service line. Rent manlift to fix Bagdad rd. tank roof panels that were damaged. Replace pump parts. Clean injector. Receive chemicals. Collins 3- Processed 791,154 gallons for a daily average of 28,255 gallons. Plow driveway. Receive chemicals.