Text · page 4 of 141
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
ZOAR VALLEY GATEWAY PARK Project Viability SparkNotes Project Concept - Cohesion, Inclusion, Efficiency, Future Expansion - Age appropriateness with public safety-centered equipment - Central hub of interaction with the Inclusive Multi SeeSaw - Custom equipment color flexibility to harmonize with existing playgrou nd Project Viability - Maximum 40 points - Construction Readiness - Sufficiency of Site Control not included in Expansion Concept (to be provided by Gowanda) - Evidence of Furtherance — Kompan onboarded as Design Professional for concept preparation, budgetary proposals, layout of addition on site o SEQR/Permitting by Gowanda o Sealed Architectural/Engineering plans available via Kompan post design approval(included in project overall budget) o Product Data provided with plans/elevations of equipment by Kompan Financial Review - 0-30 points - Total Project Budget — Provided Section 2, prepared by BCC on April 10, 2026 - Quotes/Proposals — Equipment Proposal Provided Section 2, prepared by Kompan on April 10, 2026 o includes budgetary cost for installation, freight, borders, excavation, restoration, and EWF (Engineered Wood Fiber) to match existing surface; prepared and provided by Kompan via email on April 6, 2026 - Sales Quote - To be provided by Kompan post-Owner concept approval including finalized border cost, finalized sitework cost, and finalized EWF cost Matching Funds - 0-10 points - NYS PLAYS Grant provided 80% match to $39,000 secured funds by Gowanda ~ Cannot be used alongside Municipal Parks and Recreation Gra nts Awards BUFFALO CONSTRUCTION ONS ULE TANTS 496 Kennedy Road | Buffalo, NY | 14227 | 716.302.4040 | buffaloconstruct.com