Text · page 41 of 123
Read the whole document on one page (all 123 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Highway Department Monthly Report Weekly Duties-Summer Road maintenance and repair- pot hole repair, general road resurfacing and complete road milling/paving Repair/improve damaged or sunken storm drains Crosswalk stripping- 26 crosswalks Biweekly garbage pickup- 39 garbage receptacles in the village Set up and weekly maintenance of 27 flower pots throughout the village Weekly mowing, weed trimming and clean up of 12 parks/parking lots and village guardrails Tree trimming, planting and tree removal Removal of sediment under South Chapel bridge Street sweeping- all village streets and parking lots Maintenance and cleaning of 2 amphitheaters Move brush from Palmer dump site to cemetery hill site June 9th - July 8th Repaired 2 collapsing storm drains on Aldrich st and Walnut st WN > Removed huge cottonwood that fell into thatcher brook on S Chapel DNAAR Removed storm damaged tree on Mechanic st Cleaned out 4 completely plugged catch basins and drain pipes on Beach st and upper Buffalo st Cut down large tree leaning over Townsend near Miller st. Cleaned ditches on Cemetery hill Paved 2 water leak repairs on Cemetery Hill. Patched Orchard, Johnson, Walnut, N Water, upper Buffalo, Caroline and portions of Cemetery Hill