Southtowns Record

7/14/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Jul 14, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Public safety, Roads and traffic, Zoning and land use, Budget and taxes, Parks and recreation, Audits and oversight

Original document

Same meeting

Text · page 43 of 123

Read the whole document on one page (all 123 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Gowanda Water Department
  MONTHLY BOARD REPORT
Gowanda- Processed 10,487,100 gallons for the month of June for a daily average
of 349,600 gallons. 26 Ufpo. Processed 3 work orders. Water leak on palmer.
Called gallman in to dig. Nissan van had issue with transmission solenoid. Kirk
cleaned and got it going for now. Keeping up with mowing and weed wacking
water lots. Read all meters. Changed two meters that quit working. We patched
up the potholes in reservoir driveway. Received chemicals.

Collins 1- Processed 1,779,000 gallons for a daily average of 57,400 gallons. 43
Ufpo. Processed 1 work order. Read all meters. Flushed hydrants. Monthly
samples taken. Run dist 1 weil early when bad weather was predicted or real
heavy rain. Freshen rt 62 through last fire hydrant. Noticed the town put on the
new hydrant flags they look good. Instail meter and turn on water at new build on
flavia clr. Received chemicals

Collins 3- Processed 785,524 gallons for a daily average of 26,184. Read meters.
Flush hydrants. Turn on and install meter on mill st.