CITY OF LACKAWANNA
  PLANNING AND DEVELOPMENT BOARD MEETING
  COUNCIL CHAMBERS
  TIME: 6:00 PM
  Wednesday March 25, 2026

Meeting Called to Order/Pledge of Allegiance
NB: Meeting being recorded.

Roll Call:  Board Members:  Smith, Abdulla, Buckner, Friend, Milks, Zambron
  Administrative:  Clark, Balon, Cooper, Hayes

Approval of Minutes: of the Planning and Development Board Meeting on January 28,
2026.

Motion by Friend; seconded by Zambron to adopt minutes of the Planning and Development
Board Meeting on January 28, 2026 as written.

Yeas: Smith, Abdulla, Buckner, Friend, Milks, Zambron  Carried 6-0

Communication from Planning and Development Board Applicants:

  1. Elysia Joslin (O’Reilly Auto Enterprises) & Samuel J. Burden (Bohler Engineering)
  – Site Plan Approval/SEQR Negative Declaration – 1255, 1265, 1269, and 1271
  Abbott Road – Hayden Woods of Bohler Engineering representing. Applicant
  requests the Board approve application for a new ± 7,650 SF. O’Reilly Auto Parts
  retail store to include a new building, parking, landscaping, pavement, and related
  site accessories in Neighborhood Commercial Zone. The site is proposed to include
  forty-one (41) onsite parking spaces (including 2 ADA - van accessible spaces on
  site). Two access drives are proposed to be constructed. One (1) minor commercial
  driveway from Abbott Road that will service patrons and one (1) open curb cut to
  Julian Ave that will service patrons and delivery vehicles. Two (2) curb cuts on
  Abbott Road will be closed as part of the project and new curb and sidewalk
  installed. Truck circulation will be from Abbott Road to Julian Ave where the truck
  will stage and then circulate out to Ridge Road. Other site features will include new
  utility services, stormwater mitigation features, asphalt parking and drive lanes,
  concrete curbing and sidewalk, a dumpster enclosure, LED dark sky compliant site
  lighting fixtures, landscaping, and signage. Anticipated operations are to include 7-
  days a week service from approximately 7:30AM to 9:00PM Monday to Saturday
  and 9:00AM to 7:00PM on Sunday. No tire sales or on-site service to occur; and
  approximately 12 employees with 3 to 8 employees on the grounds during operating
  hours over multiple shifts. Product deliveries to occur a few times a week during off
  hours with trash collected once a week. Board discussion further clarified the above
  points.