For an AC single-phase
P = I x V x PF
Where,
P = power (watts)
I = current (MVA)
V = voltage (volts)
PF = power factor; for this effort we will assume it is equal to 1

  P
Therefore, I =
  V x PF

For an AC three-phase
P = I x V x √3 x PF
Where,
P = power (watts)
I = current (MVA)
V = voltage (volts)
PF = power factor; for this effort we will assume it is equal to 1

  P
Therefore, I =
  V x √3 x PF

  Existing Circuit Information
  Voltage, kV  12.5
  Capacity, MVA  13.01
  Summer Peak, MVA  6.1
  Phase  3
  Current Peak Rating  46.89%

Diversified Load
Estimated Apartment Load = 807kW; 807/1000 = 0.81MVA
Proposed new peak load = 6.1 + 0.81 = 6.91MVA
Peak Rating % = (6.91/13.01) x 100 = 53.09%

  Diversified
  Total Power, kW  1,199
  Total Load, MVA  1.20
  New Peak Circuit Load,
  MVA  7.30
  Peak Rating  56.10%