Text · page 53 of 110
Read the whole document on one page (all 110 pages, each with its own heading)
Vakiener, Shelby From: Gordon, Casey (DOT) <[email protected]> Sent: Friday, August 23, 2024 12:43 PM To: Vakiener, Shelby Cc: Winkler, Kristopher; Calarco, Carl (DOT); Adam Driscoll Subject: RE: [Ext] RE: Proposed Residential Development at 2542 Clinton Street, West Seneca - NYSDOT Comments on sidewalk proposal Follow Up Flag: Follow up Flag Status: Flagged Good morning, NYSDOT has reviewed the sidewalk proposals as provided for the development at 2542 Clinton Street . At this "me, NYSDOT does not intend to make any changes to the guardrails as installed at this loca"on. NYSDOT does not object to the rou"ng shown as the “blue path” in the concept plans which installs a new sidewalk along the entrance driveway and ties into the shoulder pavement and allows pedestrians to continue on the existing shoulder to access the bridge. This sidewalk, along with all other entrance features within the State Right of Way, will require an additional engineering review with more detailed plans as part of the NYSDOT Highway Work Permit process if the development is approved by the Town. Respectfully, Casey Gordon Transportation Analyst Planning and Program Management New York State Department of Transportation, Region 5 100 Seneca Street, Buffalo, NY 14203 (716) 847-3580 [email protected] www.dot.ny.gov From: Vakiener, Shelby <[email protected]> Sent: Tuesday, August 6, 2024 10:30 AM To: Gordon, Casey (DOT) <[email protected]> Cc: Winkler, Kristopher <[email protected]>; Frei, Ronald A (DOT) <[email protected]>; Calarco, Carl (DOT) <[email protected]>; Adam Driscoll <[email protected]> Subject: RE: [Ext] RE: Proposed Residential Development at 2542 Clinton Street, West Seneca ATTENTION: This email came from an external source. Do not open attachments or click on links from unknown senders or unexpected emails. 1 Page 53 of 110