"Appendix E" of Phase 1B Field Investigation Report, as prepared by Deuel Archeology & CRM (August 2023)

  Avoidance	
  Plan	
  for	
  Locus	
  5	
  of	
  the	
  CSRH	
  Indigenous	
  Site	
  (DACRM	
  Site	
  ERI	
  P001)	
  

  The	
  Phase	
  IB	
  Archaeological	
  Field	
  Investigation	
  conducted	
  by	
  Deuel	
  Archaeology	
  &	
  CRM	
  (DACRM)	
  from	
  
  June	
  22	
  through	
  July	
  7,	
  2023	
  identified	
  a	
  previously	
  unrecorded	
  Indigenous	
  Site	
  distributed	
  across	
  5	
  loci	
  
  within	
  the	
  area	
  of	
  potential	
  effect	
  (APE)	
  for	
  the Proposed	
  Development	
  of	
  2544-­‐2574	
  Clinton	
  Street,	
  
  Town	
  of	
  West	
  Seneca,	
  Erie	
  County,	
  New	
  York.	
  Loci	
  1-­‐4	
  have	
  low	
  artifact	
  densities	
  and	
  exhibited	
  evidence	
  
  of	
  prior	
  ground	
  disturbances	
  resulting	
  in	
  a	
  lack	
  of	
  archaeological	
  integrity.	
  Therefore,	
  no	
  mitigation	
  
  measures	
  have	
  been	
  proposed	
  for	
  loci	
  1-­‐4.	
  Locus	
  5	
  of	
  the	
  site	
  has	
  temporally	
  and	
  functionally	
  diagnostic	
  
  artifacts	
  with	
  further	
  research	
  potential	
  and	
  fair	
  archaeological	
  integrity.	
  The	
  developer	
  has	
  selected	
  to	
  
  avoid	
  potential	
  adverse	
  impacts	
  to	
  locus	
  5	
  of	
  the	
  site	
  through	
  archaeological	
  monitoring	
  and	
  site	
  
  avoidance.	
  The	
  proposed	
  avoidance	
  plan	
  will	
  consist	
  of	
  the	
  following:	
  

  •  A	
  fence	
  will	
  be	
  installed	
  around	
  the	
  50-­‐foot	
  buffer	
  for	
  the	
  duration	
  of	
  construction.	
  No	
  
  disturbance	
  will	
  occur	
  in	
  any	
  portion	
  of	
  the	
  locus	
  5	
  of	
  the	
  site	
  area	
  without	
  prior	
  consultation	
  
  with	
  the	
  SHPO.	
  	
  
  •  If	
  the	
  developer	
  opts	
  to	
  demolish	
  the	
  larger	
  outbuilding,	
  which	
  overlaps	
  with	
  the	
  50-­‐foot	
  buffer,	
  
  they	
  will	
  engage	
  the	
  services	
  of	
  a	
  36	
  CFR	
  61	
  qualified	
  archaeologist	
  to	
  monitor	
  the	
  demolition.	
  
  An	
  archaeological	
  monitoring	
  protocol	
  will	
  be	
  submitted	
  to	
  the	
  SHPO	
  for	
  review	
  and	
  comment	
  
  prior	
  to	
  demolition.	
  The	
  building	
  would	
  be	
  demolished	
  and	
  its	
  foundation	
  removed	
  in	
  its	
  
  entirety,	
  to	
  an	
  assumed	
  depth	
  of	
  approximately	
  8	
  feet	
  below	
  grade;	
  excavation	
  for	
  the	
  
  foundation	
  would	
  extend	
  outward	
  only	
  approximately	
  2	
  feet	
  from	
  the	
  foundation.	
  Once	
  
  removed,	
  a	
  layer	
  of	
  clean	
  fill	
  and	
  topsoil	
  will	
  be	
  brought	
  in,	
  and	
  the	
  fence	
  will	
  be	
  installed	
  along	
  
  the	
  50-­‐foot	
  buffer	
  line.	
  If	
  the	
  developer	
  decides	
  not	
  to	
  demolish	
  the	
  larger	
  outbuilding,	
  the	
  50-­‐
  foot	
  buffer	
  fence	
  will	
  include	
  the	
  outbuilding	
  to	
  preserve	
  the	
  integrity	
  of	
  the	
  buffered	
  area.	
  	
  
  •  The	
  developer	
  plans	
  to	
  demolish	
  the	
  smaller	
  outbuilding	
  adjacent	
  to	
  the	
  50-­‐foot	
  buffer.	
  If	
  the	
  
  buffer	
  overlaps	
  with	
  the	
  building,	
  it	
  will	
  be	
  removed	
  in	
  the	
  same	
  manner	
  as	
  described	
  above	
  for	
  
  the	
  larger	
  outbuilding.	
  If	
  the	
  building	
  is	
  outside	
  the	
  buffer,	
  the	
  fence	
  will	
  be	
  installed	
  along	
  the	
  
  buffer	
  and	
  the	
  building	
  will	
  be	
  carefully	
  dismantled	
  and	
  removed	
  in	
  a	
  manner	
  that	
  avoids	
  
  ground	
  disturbing	
  activities	
  within	
  the	
  buffered	
  area.	
  	
  
  •  All	
  new	
  construction	
  and	
  associated	
  sitework	
  will	
  occur	
  outside	
  the	
  buffered	
  area.	
  	
  
  •  The	
  developer	
  plans	
  to	
  install	
  an	
  interpretive	
  plaque	
  or	
  panel	
  in	
  the	
  lobby	
  of	
  the	
  new	
  
  development,	
  which	
  will	
  inform	
  residents	
  and	
  visitors	
  of	
  the	
  history	
  of	
  the	
  site.	
  The	
  locations	
  of	
  
  the	
  recovered	
  artifacts	
  will	
  not	
  be	
  identified	
  to	
  protect	
  the	
  site	
  from	
  potential	
  looting.	
  	
  

  
  

  Page 60 of 110