Text · page 73 of 97
Read the whole document on one page (all 97 pages, each with its own heading)
(c) Charter’s operation, construction, repair and maintenance personnel, including all contractors and subcontractors, shall be trained in the use of all equipment and the safe operation of vehicles. Charter’s operation, construction, repair and maintenance personnel shall follow all safety procedures required by all applicable federal, state and generally applicable local laws and regulations, including the NESC. Charter shall install and maintain its wires, cables, fixtures, and other equipment in such a manner as shall not interfere with any installations of the Village or any public utility serving the Village. (d) Whenever Charter or any agent, including any contractor or subcontractor, shall disturb any pavement, sidewalk or other public property in order to perform any underground activity, it shall utilize the New York One Call System (www.digsafelynewyork.com) prior to any such disturbance. Charter shall adhere to any additional undergrounding requirements which the State of New York may establish in the future. Charter shall adhere to all requirements of 16 NYCRR Part 753, Protection of Underground Facilities. (e) All structures and all lines, equipment and connections in, over, under, and upon Public Rights-of-Way, wherever situated or located, shall at all times be kept and maintained in a safe and suitable condition and in good order and repair in accordance with customary industry standards and practices. 3.6 SERVICE AREA MAPS Within thirty (30) days of a written request, Charter shall make available to the Village for inspection a complete set of Charter service area maps of the Village on which shall be shown those areas in which its facilities exist and the location of all streets. Charter shall make such maps available to the Village for inspection within thirty (30) days of a written request and after execution of an appropriate non-disclosure agreement. All information provided shall be exclusive of Drops. The Village agrees to treat such maps as confidential because they constitute proprietary information. 3.7 DISCONNECTION AND RELOCATION (a) Charter shall, upon receipt of reasonable advance written notice not less than ten (10) business days, protect, support, temporarily disconnect, relocate, or remove any property of Charter when lawfully required by the Village pursuant to its police powers. Charter shall be responsible for any costs associated with these obligations to the same extent all other users of the Village’s Public Rights-of-Way are responsible for the costs related to the relocation of their facilities. (b) In requiring Charter to protect, support, temporarily disconnect, relocate or remove any portion of its property, the Village shall treat Charter the same as, and require no more of Charter than, any similarly situated entity. Charter shall have the right to seek reimbursement under any applicable insurance or government program for reimbursement. (c) Charter shall, at the request of any Person holding a lawful permit issued by the Village, protect, support, raise, lower, temporarily disconnect, relocate in or remove from the Public Rights-of-Way as necessary any property of Charter, provided that the expense of such 9