Southtowns Record

Village Board agenda — May 18, 2026

Government
Village of East Aurora
Board
Village Board
Meeting
May 18, 2026
Kind
Agenda
Topics
Zoning and land use, Public safety, Water, sewer and drainage, Budget and taxes, Roads and traffic, Parks and recreation, Audits and oversight, Moratoriums, Housing

Original document

Same meeting

Text · page 17 of 67

Read the whole document on one page (all 67 pages, each with its own heading)

by a registered design professional.
  (4)  Architectural plans for substantial modification, including a demolition plan prepared by a
  registered design professional.
  (5)  An asbestos survey pursuant to New York State Industrial Code Rule 56 (12 NYCRR 56).
  (6)  Starting and completion dates;
  (7)  Written list of materials to be salvaged;
  (8)  Provision for disposal of refuse;
  (9)  A statement as to security and/or barricades to safeguard premises from unauthorized entry
  during the demolition work as well as the protection of the general public;
  (10) A site plan application and documentation as required by Village Code Chapter 285-51.

§ 112-7. Certificate of insurance.

A.  Certificates of insurance for liability, Worker’s Compensation, or the applicable waiver, and Disability
  shall be delivered to the Code Enforcement Officer, as agent for the Village of East Aurora. The
  minimum limits of said liability for the demolition of buildings and structures, whether in a
  homeowner's insurance policy or separate liability policy, shall be in an amount as required by the
  Village.
B.  All insurance certificates shall include the Village of East Aurora as an additional named insured.
C.  Insurance certificates or agreements in a form approved by the Village Attorney, holding the Village
  of East Aurora, its officers and employees from liability resulting from work allowed by a demolition
  permit, shall be delivered to the Code Enforcement Officer as agent for the Village of East Aurora.

§ 112-8. Procedures.
A.  Upon the request of the Code Enforcement Officer, the person making the application for a permit to
  demolish a building or structure or for a substantial modification to a building or structure shall submit
  to the Code Enforcement Officer a written report from a licensed exterminator regarding
  extermination of the building or structure prior to the issuance of a demolition permit.
B.  Prior to demolition, the contractor will erect a system of barricades around the construction site and
  have the electric, gas and telephone services removed by the respective utility companies. The head
  of the Department of Public Works of the Village of East Aurora or his designated representative shall
  disconnect and cap the water service to the building or structure being demolished and plug the sewer
  laterals to such building or structure. The owner shall pay to the Village Clerk a water disconnection
  fee and a sewer disconnection fee as set forth in Chapter 137, Article II, of this Code for said
  disconnecting, capping and plugging.
C.  The contractor shall obtain appropriate approval for the water use on the site from the head of the
  Department of Public Works for dust control and have sufficient lengths of one-and-one-half-inch
  and/or two-and-one-half-inch hose for this purpose. The contractor shall provide a flagman for traffic
  control when necessary, and should a street have to be closed, he shall obtain permission from the
  head of the Department of Public Works, the Chief of Police and the Fire Chief.
D.  The contractor shall obtain all appropriate Erie County Highway or New York State Department of
  Transportation permits when necessary.
E.  In the case of the demolition of an existing building which has a common or party wall with one or
  more adjoining buildings, the owner of the building to be demolished shall be responsible for and bear