Text · page 112 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
Village of East Aurora Departments at the Village Responsible for Implementation of the Six Minimum Control Measures (MCM) MS4 Coordinator - Stormwater Management Officer - Brian Halt MCM 1 MCM 2 MCM 3 MCM 4 MCM 5 MCM 6 ILLICIT DISCHARGE POST CONSTRUCTION PUBLIC EDUCATION PUBLIC INVOLVEMENT DETECTION AND CONSTRUCTION SITES GOOD HOUSEKEEPING MANAGEMENT ELIMINATION WNYSC WNYSC DPW Building Department Building Department DPW The Coalition creates WNYSC schedules 2 (B.Halt) - Inspects outfalls, Once the SWPPP is approved and All long term post construction Implements best management graphics and designs public meetings a year and field reconnaissance before any clearing activities can measures are inspected by the practices for operational and presentations. Prepares to educate key associated with regular take place a kick-off meeting is Building Deparment before capital improvements. Staff is postcards and mailers. individuals and groups. inspections and potential held on site to be attended by the construction is completed and trained annually. Creates K-12 Education illicit discharge. Project Manager, Site NOT signed by E. Cassidy or Packages. Organizes a Conducts staff training, Superintendent and Owner's Village Supervisor. stormwater conference performs inspections, and SWPPP Inspector. Construction once in 2 years, Invites issues notices of violation. sites are monitored by the Building Guest speakers, Department. Engineering Consultants, Landscape Architects and MS4 communities. Makes presentations to TOA presents the draft (B.Halt) - Recieves calls from E. Cassidy closely monitors the The owner signs a maintenance DPW maintains facilities educate MS4 Annual Report at a residents, Code Enforcement construction sites by reviewing the agreement and files it at including buildings, salt storage, Communities and Town public meeting to Officers, Highway weekly inspection reports and County Clerk's office to ensure fueling station, Village roadways, Boards when needed. educate key individuals employees, regarding illicit issuing notice of voilations (NOV) if that the post-construction drainage infrastructures, and Maintains a website and for public input. discharges into storm system. necessary. Fourth NOV maybe measures will not be altered village facilities. related to stormwater The complaints are accompained with an admintrative without notification and will be management. investigated and necessary fine. A stop work order may also be maintained in the future. Also violations issued. issued with the help of the Code the owner file an easement Enforcement Officer. agreement the County Clerk's office to allow for period inspections by TOA. TOA posts the draft TOA participates in After the NOV is issued the site is DPW - Maintains SWMP Plan on the different Environmental inspected again in 14 days as a Village maintenance facilities website, has a groups that have follow up on the voilations including buildings, salt Stormwater Management interest in the storage, fueling station, Village webpage, reviews the stormwater roadways, drainage SWMP Plan at a public management program. infrastructures. meeting, and has a These local groups assist brochure display in the with public education Municipal Center. and involvement. 24