PLANNING BOARD -The Planning Board of the Village of East Aurora.

POLLUTANT OF CONCERN - Sediment or a water quality measurement that addresses sediment (such as total
suspended solids, turbidity or siltation) and any other pollutant that has been identified as a cause of impairment of
any water body that will receive a discharge from the land development activity.

PROJECT - A land development activity.

RECHARGE - The replenishment of underground water reserves.

SEDIMENT CONTROL - Measures that prevent eroded sediment from leaving the site.

SENSITIVE AREAS - Cold-water fisheries, shellfish beds, swimming beaches, groundwater recharge areas, water
supply reservoirs, or habitats for threatened, endangered or special concern species.

SPDES GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES GP-02-0 I - A permit under the New York State
Pollutant Discharge Elimination System (SPDES) issued to developers of construction activities to regulate
disturbance of one or more acres of land.

SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE
STORMWATER SEWER SYSTEMS GP-02-02 - A permit under the New York State Pollutant Discharge
Elimination System (SPDES) issued to municipalities to regulate discharges from municipal separate storm sewers for
compliance with EPA-established water quality standards and/or to specify stormwater control standards.

STABILIZATION - The use of practices that prevent exposed soil from erod ing.

STOP-WORK ORDER - An order issued which requires that all construction activity on a site be stopped.

STORMWATER - Rainwater, surface ru noff, snowmelt and drainage.

STORMWATER HOTSPOT - A land use or activity that generates higher concentrations of hydrocarbons, trace
metals or toxicants than are found in typical stormwater runoff, based on monitoring studies.

STORM WATER MANAGEMENT - The use of structural or nonstructural practices that are designed to reduce
storm water runoff and mitigate its adverse impacts on properly, natural resources and the environment.

STORMWATER MANAGEMENT FACILITY - One or a series of stormwater management practices installed,
stabilized and operating for the purpose of controlling stormwater runoff.

STORMWATER MANAGEMENT OFFICER (SMO) - An employee or officer of the Village of East Aurora
designated by the Village Board to accept and review stonnwater pollution prevention plans (SWPPPs), forward the
plans to such agency or board of the Village of East Aurora which may be reviewing any application for a land
development activity requiring submission ofa SWPPP, and inspect stormwater management practices.

  3