[5] Completion of final grading;
  [6] Close of the construction season;
  [7] Completion of final landscaping; or
  [8] Successful establishment of landscaping in public areas.
  (b) If any violations are found, the applicant and developer shall be notified in writing of the nature of the
  violation and the required corrective actions. No further work shall be conducted, except for site stabil ization,
  until any violations are corrected and all work previously completed has received approval by the SMO.
  (2) Stonnwater management practice inspections. The SMO is responsible for conducting inspections of SMPs.
  All applicants are required to submit "as-built" plans for any SMPs located on site after final constrnction is
  completed, The plan must show the final design specifications for all stormwater management facilities and
  must be certified by a professional engineer.
  (3) Inspection of storm water facilities after project completion. Inspection programs shall be established on any
  reasonable basis, including, but not limited to: routine inspections; random inspections; inspections based
  upon complaints or other notice of possible violations; inspection of drainage basins or areas identified as
  higher than typical sources of sediment or other contaminants or pollutants; inspections of businesses or
  industries of a type associated with higher than usual discharges of contaminants or pollutants or with
  discharges of a type which are more likely than the typical discharge to cause violations of state or federal
  water or sediment quality standards or the SP DES stormwater permit; and j oint inspections with other
  agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to:
  reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or
  water in drainage control facilities; and evaluating the condition of drainage control fac ilities and other
  stormwater management practices.
  (4) Submission ofreports. The SMO may require monitoring and reporting from entities subj ect to this atiicle as
  are necessary to determine compliance with this article.
  (5) Right-of-entry for inspection. When any new storm water management facility is installed on private property
  or when any new connection is made between private property and the public stormwater system, the
  landowner sha ll grant to the Village of East Aurora the right to enter the property at reasonable times and in a
  reasonable manner for the purpose of inspection as specified in§ 285-83A(3) of this chapter.
B. Performance guarantees; recordkeeping.
  ( I) Constrnction completion guarantee. In order to ensure the full and faithfu l completion of all land
  development activities related to compliance with all conditions set forth by the Village of East Aurora in its
  approval ofthe SWPPP, the Village of East Aurora may require the applicant or developer to provide, prior to
  construction, a performance bond, cash escrow, or irrevocable letter of credit from an appropriate financial or
  surety institution which guarantees satisfactory completion of the project and names the V illage of East
  Aurora as the beneficiary. The security shall be in an amount to be determined by the Village of East Aurora
  based on submission of final design plans, with reference to actual construction and landscaping costs. The
  performance guarantee shall remain in force until the surety is released from liability by the Village of East
  Aurora, provided that such period shall not be less than one year from the date of final acceptance or such
  other certification that the facility(ies) has (have) been constructed in accordance with the approved plans and
  specifications and that a one-year inspection has been conducted and the faci lities have been fou nd to be
  acceptable to Village of East Aurora. Per-annum interest on cash escrow deposits shall be reinvested in the
  account until the surety is released from liability.
  (2) Maintenance guarantee. Where stonnwater management and erosion and sediment control facilities are to be
  operated and maintained by the developer or by a corporation that owns or manages a commercial or
  industrial facility, the developer, prior to construction, may be required to provide the Village of East Aurora