Text · page 153 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
activity is installed or conducted in violation of this chapter, the SMO may prevent the occupancy of said building or land. vi. Additional measures, supported in local legal authorities, such as collecting against the project’s bond or directly billing the responsible party to pay for work and materials to correct violations. Enforcement Tracking The Village of East Aurora documents instances of non-compliance in this SWMP Plan. The enforcement case documentation includes, at a minimum, the following: a. Name of the owner/operator of the facility or site of the violation (can be redacted from the publicly available SWMP Plan); b. Location of the stormwater source (e.g., construction project); c. Description of the violation; d. Schedule for returning to compliance; e. Description of enforcement response used, including escalated responses if repeat violations occur or violations are not resolved in a timely manner; f. Accompanying documentation of enforcement response (e.g., notices of noncompliance, notices of violations); g. Any referrals to different departments or agencies; and h. Date violation was resolved. All documentation pertaining to Enforcement Response is considered part of tis SWMP Plan and is available upon request: contact Stormwater Program Coordinator or Stormwater Management Officer listed on page 2 of this document (Internally: C:\Users\Water Foreman\Documents\Storm Water\Enforcement Response 65