L.  If the Construc on Contract Documents specifically require the Contractor to provide
  professional design services or cer fica ons by a design professional related to
  systems, materials, or equipment, the Engineer shall specify the appropriate
  performance and design criteria that such services must sa sfy. The Engineer shall
  review and take appropriate ac on on Shop Drawings and other submi als related
  to the Work designed or cer fied by the Contractor’s design professional, provided
  the submi als bear such professional’s seal and signature when submi ed to the
  Engineer. The Engineer’s review shall be for the limited purpose of checking for
  conformance with informa on given and the design concept expressed in the
  Contract Documents. The Engineer shall be en tled to rely upon, and shall not be
  responsible for, the adequacy and accuracy of the services, cer fica ons, and
  approvals performed or provided by such design professionals.
  M.  Village shall bear full responsibility and liability for the genera on, existence, or
  presence of any toxic, hazardous, radioac ve, infec ous, mutagenic, teratogenic,
  carcinogenic, explosive, combus ble, or other dangerous substances (“hazardous
  materials”) pre-exis ng at the site. Village affirms certain addi onal responsibili es
  under the Agreement, including without limita on the following:

  1.  Village shall grant or cause to be granted a license of right-of-way to Engineer
  to access all sites necessary for the performance of the Services under this
  Agreement.
  2.  Village shall furnish or cause to be furnished to Engineer all documents and
  informa on known to Village that relate to the iden ty, loca on, quan ty,
  nature, or characteris cs of any hazardous materials at or near the site(s).
  3.  Unless otherwise required by law or set forth in this Agreement, Village shall be
  responsible for accurately loca ng and prominently marking all buried,
  concealed, or submerged pipes, tanks, cables, u li es or other man-made
  obstruc ons (“underground facili es”) that may affect or be affected by
  Engineer’s services.

  N.  Unless otherwise included under this Agreement, the par es acknowledge that
  Engineer’s Task Authoriza on does not include any services related to a Hazardous
  Environmental Condi on (the presence of asbestos, PCBs, petroleum, hazardous
  substances or waste, and radioac ve materials). Village represents to Engineer that,
  to the best of its knowledge, a Hazardous Environmental Condi on does not exist at
  the Site, except as expressly disclosed to the Engineer in wri ng. If Engineer or any
  other party encounters a Hazardous Environmental Condi on, Engineer may, at its
  op on and without liability for consequen al or any other damages, suspend
  performance of services on the por on of the Project affected thereby un l Village:
  (i) retains appropriate specialist Engineers or contractors to iden fy and, as
  appropriate, abate, remediate, or remove the Hazardous Environmental Condi on;
  and (ii) warrants that the Site is in full compliance with applicable Laws and
  Regula ons.

  Page 3
V. E. Aurora-B&L MSA FY 2026-27 (ID 3593336).docx