Text · page 29 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
b. Public Notice and Input Requirements for Draft Annual Report Annually, provide an opportunity for the public to review and comment on the draft Annual Report. Document the opportunity below. 1. For public review and comment, the draft Annual Report will be presented at a regular meeting of an existing board (e.g., administrative, planning, zoning) or a separate meeting specifically for stormwater, as designated by the MS4 or if requested by the public. The public must have the ability to ask questions about and make comments on the draft annual report during that presentation; or 2. For public review and comment, the draft Annual Report will be posted on the Village of East Aurora website: www.east-aurora.ny.us/government/public-works-department . The website includes information on the timeframes and procedures to submit comments and/or request a meeting. If a public meeting is requested by two or more persons, the MS4 Operator must hold such a meeting. Compliance documentation is listed in Appendix B. c. Consideration of Public Input Annually, the Village of East Aurora documents a summary of comments received on the SWMP Plan and draft Annual Report. Compliance documentation is listed in Appendix B.