Text · page 55 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
i. Keep all dumpster lids closed when not in use. For dumpsters and roll off boxes that do not have lids and could leak, ensure that discharges have a control (e.g., secondary containment, treatment); and ii. Keep exposed areas free of waste, garbage, and debris or intercept them before they are discharged: a) Manage trash containers at parks and open space (scheduled cleanings; sufficient number); b) Pick up trash and debris on Village of East Aurora owned/operated property and rights of way; and c) Clean out catch basins within the appropriate timeframes as noted later in this section. h. Alternative Implementation Options When alternative implementation options are utilized, require the parties performing municipal operations as contracted services, including but not limited to street sweeping, snow removal, and lawn/grounds care, to meet permit requirements as the requirements apply to the activity performed. 2. Municipal Facilities33 a. Municipal Facility Program Within three (3) years The Village of East Aurora has a municipal facility program that includes BMPs to minimize stormwater pollution from municipal operations, differentiation of BMPs applicable to high or low priority facilities, and employee training. The municipal facility program is documented for this SWMP Plan as follows: i. Municipal facility procedures: a) All BMPs incorporated into the municipal facility program; b) High priority municipal facility requirements, that are specific to municipal operations occurring at each high priority facility; and c) Low priority municipal facility requirements that are specific to municipal operations occurring at each low priority facility. ii. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has an employee training program addressing its municipal facility procedures. This training addresses on-site facility operations and is conducted concurrently with municipal operations procedures. a) All new staff that are charged with conducting municipal facility procedures/BMPs will receive training on procedures prior to doing so;