Southtowns Record

Village Board agenda — May 4, 2026

Government
Village of East Aurora
Board
Village Board
Meeting
May 4, 2026
Kind
Agenda
Topics
Water, sewer and drainage, Zoning and land use, Public safety, Budget and taxes, Parks and recreation, Roads and traffic, Audits and oversight, Moratoriums, Energy and data center siting, Short-term rentals, Housing

Original document

Same meeting

Text · page 58 of 240

Read the whole document on one page (all 240 pages, each with its own heading)

d. High Priority Municipal Facility Requirements
i. Municipal Facility Specific SWPPP
Within five (5) years
The Village of East Aurora has a municipal facility specific SWPPP for each high priority municipal
facility. A copy of the municipal facility specific SWPPP is retained on site at the respective municipal
facility. The Village of East Aurora SWPPP contains the following:
  a) Stormwater Pollution Prevention Team
  The municipal facility specific SWPPP must identify the individuals (by name and/or title) and
  their role/responsibilities in developing, implementing, maintaining, and revising the
  municipal facility specific SWPPP. The activities and responsibilities of the team must address
  all aspects of the municipal facility specific SWPPP.

  b) General Site Description
  A written description of the nature of the activities occurring at the municipal facility with a
  potential to discharge pollutants, type of pollutants expected, and location of key features as
  detailed in the site map.

  c) Summary of potential pollutant sources
  The municipal facility specific SWPPP must identify each area at the municipal facility where
  materials or activities are exposed to stormwater or from which authorized non-stormwater
  discharges originate, including any potential pollutant sources for which the municipal
  facility has reporting requirements under the Emergency Planning and Community Right-To-
  Know Act (EPCRA), Section 313.

  i) Materials or activities include: machinery; raw materials; intermediate products;
  byproducts; final products or waste products; and, material handling activities which
  includes storage, loading and unloading, transportation or conveyance of any raw
  material, intermediate product, final product or waste product.

  ii) For each separate area identified, the description must include:
  • Activities - A list of the activities occurring in the area (e.g., material
  storage, equipment fueling and cleaning);
  • Pollutants - A list of the associated pollutant(s) for each activity. The
  pollutant(s) list must include all materials that are exposed to stormwater;
  and
  • Potential for presence in stormwater - For each area of the municipal
  facility that generates stormwater discharges, a prediction of the direction
  of flow, and the likelihood of the activity to contaminate the stormwater
  discharge. Factors to consider include the toxicity of chemicals, quantity of
  chemicals used, produced or discharged, the likelihood of contact with
  stormwater; and history of leaks or spills of toxic or hazardous pollutants.
  d) Spills and Releases
  For areas that are exposed to precipitation or that otherwise drain to a stormwater
  conveyance to be covered under this SPDES general permit, the municipal facility specific