Text · page 71 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
Vehicle maintenance: Date of completion: Method used: Stormwater pollution prevention information provided at time of municipal fire inspections (1x/3 year) Uncovered materials exposure/storage: Date of completion: Method used: Stormwater pollution prevention information provided at time of municipal fire inspections (1x/3 year) Illicit Discharge: Date of completion: Method used: Stormwater pollution prevention information provided at time of municipal fire inspections (1x/3 year) Iii. Institutions: Managers, Staff, and Students (Institutions Not Subject to SPDES MS4/MSGP Stormwater Permitting) Uncovered materials exposure/storage: Date of completion: Method used: Stormwater pollution prevention information provided at time of municipal fire inspections (1x/3 year) Iv. Construction: Developers, Contractors, And Design Professionals: Soil disturbance: Date of completion: 1/1/2025; 2/19/2025; 1/14/2026; 2/10/2026 Method used: NYSDEC 4 Hour Erosion & Sediment Control Training Uncontained construction waste: Date of completion: 1/1/2025; 2/19/2025; 1/14/2026; 2/10/2026 Method used: NYSDEC 4 Hour Erosion & Sediment Control Training