Table 1 (Continued) CONSTRUCTION A CTIVITIES THAT REQUIRE THE P REPARATION OF A SWPPP THAT ONLY INCLUDES EROSION AND SEDIMENT C ONTROLS The following construction activities that involve so il dist urbances of o ne (1) or more acres of Jana: Spoil areas that will be cov ered with vegetation Vegetated open space projects (i.e. recreational parks, lawns, meadows, fields, downhill skj traits) excluding projects that alter hydrology from pre to post development conditions, Athletic fields (natural grass) that do not include the construction or reconstruction of impeNious Dre'1 and do not alter hydrology from pre to post development conditions Demolition project where vegetation will be established, and no redevelopment is planned Overhead electric transmission line project that does not include the constructK>n of permanent access roads or parking areas surfaced with impervious cover Structural practices as identified in Table II in the •Agricultural Management Practices Catalog for Nonpoint Source Pollution in New York State•, excluding projects that involve soi1disturtJances of greater than five acres and construction activities that include the construction or reconstruction of impervious area Temporary access roads, median crossovers, detour roads, lanes, or other temporary impervious areas that will be restored to pre-construction conditions once the construction activity is complete 4