Text · page 94 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
Construction Activities that Require SWPPP Appendix E (continued) Table 2 (Continued) C ONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES POST-CONSTRUCTION STORMWATER MANAGEMENT P RACTICES The following construction activities that involve soil disturbances of one (1) or more acres of land: Parking lot construction or reconstruction, including parking lots constructed as part of the construction activities listed in Table 1 Athletic fields (natural grass) that include the construction or reconstruction of impervious area (>5% of disturbed area) or alter the hydrology from pre to post development conditions Athletic fields with artificial turt Pem,anent access roads, parking areas, substations, compressor.stations and well driUing pads, surfaced with impeNious cove~ and constructed as part of an over-head electric transmission line project. wind.power project, ceO tower project. oil or gas well drilling proj ect, sewer or water main project or other linear utility project Sidewalk, bike path or walking path projects, surfaced with an impervious cover, that are part of a residential, commercial or institutional development Sidewalk, bike path or walking path projects, surfaced with an impervjous cover, that are part of a highway construction or reconstruction project • AHother construction activities that include the construction or reconstruction of impervious area or alter the hydrology from pre co post development conditions, and are not listed in Table 1 6