SWPPP Review Checklist  Appendix F (continued)

  NEW YORK STATE DEPARTMENT OF ENVIRONMENTALCONSERVATION
  DIVISION OF WATER
  SPDES General ?ermil ! 0< Stwm, ater Discharges from COnstruc tion ActM ty (G P-0-15-002)
  Stormwater Pollution Prevention Plan Review Checklist

  eXisting a nd final contours. tocotions o f soil types & boundaries,
  material/Waste/borrow/ equip ment storage areas, locations o f stormwoter
  discharges, and locotion/size/ lenglh o/ each E&SC  111.B.l.g .
 □  □  □  Location a nd sizing o f any tempotary sediment basins. or struc tural prac tices  Ol.8.1.h.
  planned to divert flows from exposed soils are inc luded
 □  □  □  Maintenance inspection schedule, in occordonce with the NYS Standards &  111.B. l .i.
  Specs tor E&SC.s is induded
 □  □  □  Pollution Prevention measures to control litter, c hemicals, debris are described.  111.B.1.j.
 □  □  □  Description & location of any indusfrial stormwoter dscharges  111.3.1 .k.
  ~.e .. c oncrete, a sphault, etc .} is inciuded

 Post.construc tion Stormwater Mcmagernent Practices
 Yes  No  N/A or N/R  Cijafton
 □  □  □  SW PPP is prepared by a Qualified Professional.  IIIA.3.
 □  □  □  SWPPP identifies contracfor/subcontractor responsible for constructing the SMPs. ULA.6.
 □  □  □  Des,gn Manual planning process f0< reducing runoff is employed:  111.B.2.
  Site planning to preserve natural features and reduce impervious cover,
  Co1culotion o f the WQ, fot the site,
  Incorporation of runoff ,eduction techniques a nd standard S"'-Ps with Runoff Reduction
  Volume (RR,) capacity,
  Determine ninimum R:R" regufred
  Use o f standard SMPs where applicable to freo:t the rerooiniog WO... not oddressed by
  runoff reduction technic:,.>es and stondad SMPs with RRv c ap acity,
  design of volume a nd peak rot e control practices where required
 □  □  □  SW PPP documents selection, d esign. installation. implementation a nd  Ill.A 1
  maintenance of SMPs
 □  □  □  SMPs o re designed in conformance with the applicable sizing a nd performance 111.B.2.
  Cliteria in the NYS Stormwater Manag ement Design 1'1,anuo1 (Jan. 2015);
  or equivd:ence to this standard is demonstrated a nd reason for the altemative is
  provided.  111.B.2.c .vi.
 □  □  □  .AJJSMPs ore identified, induding dimertSfOns, material specs & ins1allation details. 111.B.2.o .
 □  □  □  location & size of SMPs are shown oo a site mop o r construction drawing.  111.B.2.b .
 □  □  □  SWPPP indudes a Stormwater 1\1\odefing and Analysis Report that c ootoin:;:  111.8.2.c .
  Predevelo pment mop w/ watershed/subcotchment boundaries. flO"N paths &design
  points, /Ust further d etcil per App. G Design Monvol>J
  post-development map showing some plus SMPs,
  hydrology & hydraulic results for 1equfred storm ev ents includ.ng supporting colcl.Aations,
  methodobgy ond o summary fable comparing pre & post-development runoff rates &
  volumes tor the different storm ev en1s,
  summary table w/ c alculations showing th:::11 ea. SMP conforms w/ the [)esjgn Manual
  sizing c riteria

  8