Southtowns Record

Village Board agenda — April 20, 2026

Government
Village of East Aurora
Board
Village Board
Meeting
Apr 20, 2026
Kind
Agenda
Topics
Budget and taxes, Zoning and land use, Public safety, Water, sewer and drainage, Parks and recreation, Roads and traffic, Audits and oversight, Moratoriums

Original document

Same meeting

Text · page 51 of 149

Read the whole document on one page (all 149 pages, each with its own heading)

3/13/2026
  Fund  Capital  Full
  Asset Type Desc  Description or Model  Footage  Aprox. Cost  Water  Equipment  Ways to fund
  Code  improv  reconstruct

Vehicles and Equipment
Machinery & Equipment  PRINOTH SW 4S SIDEWALK Plow  A  200,000  in process from reserve
Machinery & Equipment  Plow Truck large Dump  A  330000  1  Save in reserve til can buy
Machinery & Equipment  Fuel System, Underground Split (to make above ground)  A  225,000  2  Save in reserve til can buy
Machinery & Equipment  Caterpillar Compactor Tandem Vibratory 39" roller  A  75,000  3  Save in reserve til can buy
Machinery & Equipment  Plow Truck large Dump  A  330000  4  Save in reserve til can buy
Machinery & Equipment  Plow Truck large Dump  F- Water  330000  5  Save in Water reserve til we can buy
Machinery & Equipment  VAC Truck  F  500,000  6  Save in Water reserve til we can buy
Machinery & Equipment  INT'L CAB & CHASSIS, 80-100' AERIAL LIFT  A  300,000  7  Save in reserve til can buy
Machinery & Equipment  FREIGHTLINER PANEL VAN  F- Water  220,000  8  Save in Water reserve til we can buy
Machinery & Equipment  Pumper truck  A  1,100,000  F-1  Save in reserve til can buy
  Referb Pumper truck (2004 - Truck 1 or 3 The twins hopefully will get the trucks at least to the
Machinery & Equipment  200,000  F-2  Save in reserve til can pay for cash
  30 year mark)
Machinery & Equipment  FLY Car (current is 2016)  A  100,000  F-3  Save in reserve til can buy
Machinery & Equipment  Mini Pumper  A  475,000  F-4  Save in reserve til can buy
Machinery & Equipment  Radios - Fire  A  285,000  F-5  Grant or Save
Machinery & Equipment  Radios - Police (If County system)  A  250,000-300,000  P-1  Grant or Save

Land and Building Improvements
Buildings  Hamlin Park Plan items  A  Started
Buildings  Bathroom at Recreation Building bump out  A  260,000  In process
  Walkways - only paving one  A  300,000  P-1  Grant/ Budget or Excess FB or reserves
  Lighting  A  100,000-200,000  P-2  Excess FB or reserves
  Playground  A  200,000  P-3  Excess FB or reserves
  Parking lot Long  A  40,000  P-4  Excess FB or reserves

Buildings  DPW roof  A  450,000  1  In process
Buildings  Police Station Renovations  A
Buildings  Police Windows  A  200000+ may need more $  2  In process
Buildings  Police station Front steps 571 Main  A  TBD  3  Reserve, budget
Machinery & Equipment  Police Surveillance system  A  25,000  4  Reserve, budget
Buildings  Dispatch Room update  A  TBD  5  Reserve, budget
Buildings  Police Station roof (2006 20 or 30 year warrenty per Matt)  A  250,000  6  Reserve, budget
Buildings  Flooring in back officer entrance  A  TBD  7  Reserve, budget
Buildings  Police - Evidence room  A  70,000  8  Reserve, budget
Buildings  Police Station Conference room in the old chief office  A  TBD  9  Reserve, budget
  Locker room in the old red room  A  TBD  10  Reserve, budget

Water Projects
Infrastructure  E Fillmore (full reconstruction - Plus 1.36 million for road portion)  2088'  F- Water  700,700  1  Bond when appropriate or Reserve
Infrastructure  Elmwood Ave from Chestnut Hill to Dead End (full reconstruction - plus 1.1 Million for for the road portion) 1725'  F- Water  577,500  2  Bond when appropriate or Reserve
Infrastructure  Hamlin Ave water main (Full reconstruction - plus 453,000 for the road portion)  2300'  F- Water  759,000  3  Bond when appropriate or Reserve
Infrastructure  Millard Fillmore Ave water main  625'  F- Water  216,700  4  excess FB, reserves
Infrastructure  Temple Pl water main  410'  F- Water  146,124  4  excess FB, reserves
Infrastructure  N Grove St water main  1475'  F- Water  486,750  6  excess FB, reserves
Infrastructure  Crescent Ave water main  825'  F- Water  272,800  7  excess FB, reserves
Infrastructure  Penn Ave water main  765'  F- Water  265,100  7  excess FB, reserves
Infrastructure  Park Place - Main to Oakwood  F- Water  150000  9  Bond when appropriate
Infrastructure  Church St water main  1750'  F- Water  577,500  10

Full Road Reconstruction
Infrastructure  E Fillmore (full reconstruction - Plus 637,000 for water portion)  2088'  A  1,496,000  1 Bond when appropriate or Reserve
Infrastructure  Elmwood Ave from Chestnut Hill to Dead End (full reconstruction - plus 525,000 for for the water portion) 1725'  A  1,210,000  2 Bond when appropriate or Reserve
Infrastructure  Hamlin Ave water main (Full reconstruction - plus 690,000 for the water portion)  2300'  A  498,300  3 Bond when appropriate or Reserve

Projects for Future Ranking
Infrastructure  Sidewalks South st. from S. Grove to ccenter  A  100,000?