Text · page 35 of 254
Read the whole document on one page (all 254 pages, each with its own heading)
registered design professional. (5) Starting and completion dates; (6) Written list of materials to be salvaged; (7) Provision for disposal of refuse; (8) A statement as to security and/or barricades to safeguard premises from unauthorized entry during the demolition work as well as the protection of the general public; (9) A site plan application and documentation as required by Village Code Chapter 285. C. An application and permit fee as set forth in Chapter 137, Article II, of this Code shall accompany all demolition permit applications. Permits and fees are further established by § 285-62D of the Code of the Village of East Aurora. [Amended 3-14-2006 by L.L. No. 1-2006; 7-20-2009 by L.L. No. 5-2009] § 112-3. Certificate of insurance. A. Certificates of insurance for liability, Worker’s Compensation, or the applicable waiver, and Disability shall be delivered to the Code Enforcement Officer, as agent for the Village of East Aurora. The minimum limits of said liability for the demolition of buildings and structures, whether in a homeowner's insurance policy or separate liability policy, shall be in an amount as required by the Village. [Amended 3-14-2006 by L.L. No. 1-2006; 7-20-2009 by L.L. No. 5-2009] B. All insurance certificates shall include the Village of East Aurora as an additional named insured. C. Insurance certificates or agreements in a form approved by the Village Attorney, holding the Village of East Aurora, its officers and employees from liability resulting from work allowed by a demolition permit, shall be delivered to the Code Enforcement Officer as agent for the Village of East Aurora. [Amended 3-14-2006 by L.L. No. 1-2006] § 112-4. Procedures. A. Upon the request of the Code Enforcement Officer, the person making the application for a permit to demolish a building or structure or for a substantial modification of a building or structure, shall submit to the Code Enforcement Officer a written report from a licensed exterminator regarding extermination of the building or structure prior to the issuance of a demolition permit. [Amended 12- 1-1986 by L.L. No. 28-1986] B. Prior to demolition, the contractor will erect a system of barricades around the construction site and have the electric, gas and telephone services removed by the respective utility companies. The head of the Department of Public Works of the Village of East Aurora or his designated representative shall disconnect and cap the water service to the building or structure being demolished and plug the sewer laterals to such building or structure. The owner shall pay to the Village Clerk a water disconnection fee and a sewer disconnection fee as set forth in Chapter 137, Article II, of this Code for said disconnecting, capping and plugging. [Amended 3-14-2006 by L.L. No. 1-2006] C. The contractor shall obtain appropriate approval for the water use on the site from the head of the Department of Public Works for dust control and have sufficient lengths of one-and-one-half-inch and/or two-and-one-half-inch hose for this purpose. The contractor shall provide a flagman for traffic control when necessary, and should a street have to be closed, he shall obtain permission from the head of the Department of Public Works, the Chief of Police and the Fire Chief. [Amended 3- 14-2006 by L.L. No. 1-2006] D. The contractor shall obtain all appropriate Erie County Highway or New York State Department of