Southtowns Record

Village Board agenda — March 2, 2026

Government
Village of East Aurora
Board
Village Board
Meeting
Mar 2, 2026
Kind
Agenda
Topics
Public safety, Zoning and land use, Roads and traffic, Water, sewer and drainage, Audits and oversight, Budget and taxes, Housing, Parks and recreation, Moratoriums

Original document

Same meeting

Text · page 71 of 78

Read the whole document on one page (all 78 pages, each with its own heading)

MAPLE STREET (CR 241)

  NORTH
  GRID
  PROJECT NO. FA-5764.22-26

  ADB
  SHEET NO. 25 OF 32

  ITEM 647.61

  ST.OF THE WESL
  WNY DI  EYAN CH.  PARKING
  CHECKED BY

  NYP1-2
  C/O EA WESL EYAN CHURCH
  ITEM 647.31
  HAMLIN PARK  12"X18"
  NFTA
  ANY

  ST
  364 MAIN STREET  METRO
  ITEM 647.61  ROYCROFT PAVILION  ITEM 645.5101

  ENTI
  TA#:1  20-
  64.  27
  3-  TIME  70
  ITEM 645.81  ITEM 645.81

  ST SCI
  N STREET
  2-
  1 2
  ST CHURCH OF CHRI

  20-
  64.  HERE TO
  CORNER
  367 MAI
  TA#:1
  CLS

  12+75, SEE BELOW
  1
  ESTIMATED BY

  2'-0" CURB OFFSET
  E

  STA M 10+00
  BEGIN PROJECT

  18" WHITE STOP  11'-0" TRAVEL LANE  4" YELLOW FULL BARRIER LINE
  TYPE 'LS' WHITE
  CROSSWALK MARKINGS  BAR MARKING  ITEM 685.1202 (TYP.)  MAPLE STREET (CR 241)
  ITEM 685.3104  ITEM 685.3104

  MATCHLINE STA M
  M 10+00  M 11+00  M 12+00
  DBA

  STA M 10+63
  4" WHITE LANE LINE

  AB WAT
  ITEM 685.1102 (TYP.)

  AN ER
  11'-0" TRAVEL LANE

  DO
  M 10+45

  NE
  LIMIT OF FULL DEPTH RECONSTRUCTION.

  D
  CHECKED BY

  BEGIN PAVEMENT MARKINGS.
  2'-0" CURB OFFSET

  ABANDONED WATER
  US 20A/NY 78/NY 16)
  dgn

  EAST MAIN STREET
  001 - M aple and Pine Recon\Design\CADD\Sheet Files - M aple Final Design\SPM -01.

  JA

  PARKING
  NYP1-9
  HERE TO  AS'EPI
  ST.MATTHI  SCOPAL CHURCH
  12"X18"  HERE TO
  374 MAIN STREET
  ITEM 645.5101  CORNER  CORNER  TA#:1  20-
  64.  28
  3-
  DRAFTED BY

  ITEM 645.81
  (

  ITEM 647.61
  BABBAGE MARY R L/E LIFE
  USE & RYAN JEREMY M  MUMM JENNIFER J & MUMM
  39 MAPLE STREET  JASON A

  VEWAY
  49 MAPLE STREET

  STONE
  NYP1-2  TA#: 164.20-3-24
  12"X18"  PARKING  TA#: 164.20-3-23.2

  DRI
  ITEM 645.5101  ANY
  ITEM 645.81
  TIME
  CLS

  ITEM 647.61

  15+50, SEE SPM-02
  12+75, SEE ABOVE
  DESIGNED BY

  2'-0" CURB OFFSET

  11'-0" TRAVEL LANE
  4" YELLOW FULL BARRIER LINE
  ITEM 685.1202 (TYP.)
  MAPLE STREET (CR 241)
  DTB

  MATCHLINE STA M

  MATCHLINE STA M
  M 13+00  M 14+00  M 15+00
  11'-0" TRAVEL LANE
  4" WHITE LANE LINE
  025.

  JOB MANAGER

  ITEM 685.1102 (TYP.)
  \Project\135 - ERIE COUNTY\135.

  2'-0" CURB OFFSET
  SDK
  DATE/TIM E = 12/18/2025

  RONAN WILLIAM P
  USER = dborcz

  DESIGN SUPERVISOR

  & RONAN NANCY A
  HARMON PHILLIP
  377 FILLMORE AVENUE
  34 MAPLE STREET
FILE NAM E = F:

  TA#: 164.20-3-31
  TA#: 164.20-3-30
  10  0  10  20  ERIE COUNTY DEPARTMENT OF PUBLIC WORKS  SHEET NO.: 25
  DIVISION OF HIGHWAYS
  DATE: DEC 2025
  95 FRANKLIN STREET  BUFFALO, NEW YORK
  NO ALTERATION PERMITTED HEREON EXCEPT AS  RECONSTRUCTION OF MAPLE ST (CR 241), PIN 5764.22  SCALE: 1"=20'
  PROVIDED UNDER SECTION 7209 SUBDIVISION 2
  OF THE NEW YORK EDUCATION LAW.  MAPLE STREET SIGN & PAVEMENT MARKING PLAN  DWG. NO.: SPM-01