The meeting was called to order at 7:06 PM.
PLEDGE OF ALLEGIANCE
Kaitlin Chmura led the meeting attendees in the recitation of the Pledge of Allegiance
ROLL CALL
Present: Member Chmura, Member Geraci, Member Ryan, Member Stewart,
Member Quandt (alternate)
Absent: Chair Gronachan (Excused), Member Clark (Excused), Member
Zajac (Excused)
Staff: Joshua Rogers, Planning Department; Planning Board Attorney
Joseph Gogan; Camie Jarrell, Engineering Department
Public Hearing- 7:00 P.M., Liza Acanfora- Requesting Site Plan and Special Use
Permit Approval on a proposal for a childcare center to be located at 4090 Jeffrey
Blvd.
Steve Geltz of Daryl Martin Architects appeared on behalf of the project.
Mr. Rogers explained to the Board that the Applicant did get their area variance
approval from the Zoning Board of Appeals. Prior to that meeting, the Planning Board
issued a Negative Declaration for the project.
Mr. Geltz added that the Zoning Board of Appeals approved the reduction of required
square footage for the outdoor playground from 4,500 sq-ft to 3,000 sq-ft. He mentioned
there is an existing parking lot that is going to be restriped, and the playground will be
set on top of the asphalt.
Member Geraci read the following Public Hearing Notice:
1
Page 2
Town of Hamburg Planning Board Minutes July 15, 2026
“Notice is hereby given that the Town of Hamburg Planning Board will conduct a
public hearing on a proposal for a childcare center to be located at 4090 Jeffrey
Boulevard. The Public Hearing will be held on July 15, 2026, at 7:00 p.m. in Room
7A/7B of Hamburg Town Hall.”
Member Chmura declared the public hearings open.
No one spoke.
Member Chmura declared the public hearing closed with no comment provided.
Southtowns Early Learning Nest, LLC Day Care Center
4090 Jeffrey Blvd
Site Plan and Special Use Permit Approval Resolutions
July 15, 2026
SEQR
Whereas, The Hamburg Planning Board received a site plan, special use permit, and
area variance application from Southtowns Early Learning Nest, LLC for the interior
buildout of a 5,000 sq-ft daycare center with a new 3,000 sq-ft playground exterior to be
located at 4090 Jeffrey Blvd; and
Whereas, the proposed interior build-out area is now approximately 6,500 sq-ft,
differing from the originally notated 5,000 sq-ft; and
Whereas, The Hamburg Planning Board held the required public hearing for this project
on July 15th, 2026; and
Whereas, the Town of Hamburg Planning Board in accordance with the New York State
Environmental Quality Review Act (SEQRA) has done a thorough review of the project
and has determined that there is no significant adverse environmental impacts; and
Whereas, the proposed project was classified as an Unlisted Action under the State
Environmental Quality Review Act (SEQRA) and the Planning Board issued a Negative
Declaration for this project on July 1st, 2026; and
Now, Therefore, Be it Resolved, that the Town of Hamburg Planning Board has
determined that the previously issued Negative Declaration is still applicable.
There was a motion made by Member Stewart, with a second from Member Ryan.
Resolution passed with no opposition.
2- Special Use Permit
2
Page 3
Town of Hamburg Planning Board Minutes July 15, 2026
Whereas, the Town of Hamburg has reviewed the special use permit application from
Southtowns Early Learning Nest, LLC for the interior buildout of a 6,500 sq-ft daycare
center with a new 3,000 sq-ft playground exterior to be located at 4090 Jeffrey Blvd,
based on a determination by the Town Code Enforcement Officer; and
Whereas, the Hamburg Planning Board held the required Public Hearing on July 15th,
2026, and received no objections from the public; and
Whereas, the Hamburg Planning Board in reviewing the proposed project (special use
permit), has determined, in accordance with Section 280-312 and 280-321 (Nursery
schools and day-care centers) that:
1. The project will be in harmony with the purposes and intent of Section 280-312
(Special Use Permits).
2. The project will not create a hazard to health, safety and general welfare.
3. The project will not alter the essential character of the neighborhood, nor will it be
detrimental to its residents.
4. The project will not otherwise be detrimental to the public convenience and
welfare.
For nursery schools and day-care centers:
A. Nursery schools or day-care centers shall not receive an occupancy permit until
licensed by the State of New York.
B. Adequate outdoor play space shall be provided based on the number of children.
There shall be a minimum of 75 square feet per child under the age of three and
100 square feet per child three years and older. No play area or equipment shall
be located in the front yard.
C. Where a nursery school or day-care center abuts a residential property or an
area zoned residential, there shall be a minimum thirty-foot buffer with adequate
screening as determined by the Planning Board.
D. Child discharge and pickup areas shall not be in the public right-of-way.
E. There shall be one off-street parking space for each full-time staff person and a
minimum of three spaces for parents and visitors.
Whereas, the Applicant was unable to meet Special Use Permit standard (B) which
required 4,500 sq-ft of outdoor play space, and required an area variance to receive
relief from the Code for 3,000 sq-ft of outdoor play space; and
Whereas, the Applicant received approval of an area variance from the Hamburg
Zoning Board of Appeals for the allowable square footage of 3,000 square feet for the
outdoor play space at their July 7th, 2026, meeting.
3
Page 4
Town of Hamburg Planning Board Minutes July 15, 2026
Now, Therefore, Be it Resolved, that the Town of Hamburg Planning Board hereby
determines that the proposed special use permit is in accordance with the requirements
of the Town of Hamburg and therefore a special use permit is hereby issued with the
following conditions:
1. Approval is based on the Site Plan approved by the Planning Board (dated
7/6/26) with any conditions attached to that Plan.
There was a motion made by Member Stewart, with a second from Member Quandt
Resolution passed with no opposition.
3- Site Plan
Whereas, the Town of Hamburg received a Site Plan Application from Southtowns Early
Learning Nest, LLC for the interior buildout of a 6,500 sq-ft daycare center with a new
3,000 sq-ft playground exterior to be located at 4090 Jeffrey Blvd; and
Whereas, the Hamburg Planning Board held the required Public Hearing on July 15th,
2026; and
Whereas, the Hamburg Planning Board has reviewed the project against the Town
Code, has received input from Town departments and other agencies, and provided
input to the applicant that has resulted in amended plans addressing the Planning
Board’s concerns;
Now, Therefore, Be it Resolved, the Hamburg Planning Board issues conditional site
plan approval for this project with the following conditions:
1. Approval is contingent upon the Engineering Department comment letter dated
7/13/2026.
2. Concrete sidewalks shall be provided as denoted on the site plan dated 7/6/26.
There was a motion made by Member Stewart, with a second from Member Ryan
Resolution passed with no opposition.
Radius Federal Credit Union- Requesting Site Plan Approval on a proposal for a
2,460 sq-ft credit union with a drive thru, 4-car garage, and other associated site
improvements to be located at 5505 Southwestern Blvd
Anthony Pandolfe of Carmina Wood appeared on behalf of the project.
Mr. Pandolfe provided an update for the Board that there are two current locations of
Radius in Angola and Kenmore, and based off of those locations, there is a maximum of
4
Page 5
Town of Hamburg Planning Board Minutes July 15, 2026
2-3 cars stacking even though the stacking plan provided shows 14 stacking spaces on
site. He further explained that the Applicant is looking at no more than six (6)
employees, and they are providing 22 parking spaces, which leaves a total of 16 spaces
for customers.
Mr. Rogers stated that from a zoning point, the site is zoned C-2, so this is an allowable
use. From a SEQR standpoint, because the size of the bank is under 4,000 sq-ft, this is
considered a Type II action, so the Planning Board would not be required to do any
further environmental reviews.
Town Engineer Camie Jarrell asked the Applicant if the limited disturbance been
addressed?
Mr. Pandolfe answered that some measurements have been done based on the site
plan which can obviously vary a little with final grading, but they do not feel that there
will be much disturbance. Since this is 0.8 acres, they are under the one (1)-acre
threshold for a SWPPP.
Member Ryan asked the Applicant where does someone get their membership from?
The Applicant responded that to be a member to the credit union, you need to live, work
or worship in Erie County.
Mr. Gogan added that on the map, there are existing garages on the premises, but not
on the site plan.
Mr. Pandolfe responded those will be demolished. The only existing structure will be the
garage which will be used solely for storage purposes.
The project was then tabled to the August 5th, 2026, Planning Board meeting for a public
hearing.
Planning Board to discuss the draft Final Environmental Impact Statement
submitted by Parker Road Developers, LLC regarding a proposed subdivision to
be located on the west side of Parker Road, south of Big Tree Road
Attorney Sean Hopkins and Dave Manko appeared on behalf of the project.
Mr. Rogers provided the following overview for the Planning Board:
• In 2021 the Planning Board did give a positive declaration for this subdivision
project.
• The applicant did put a DEIS together and the previous Planning Board felt that
there were some deficiencies with that DEIS that the applicant addressed and
resubmitted and it was then accepted as complete.
5
Page 6
Town of Hamburg Planning Board Minutes July 15, 2026
• What is this Board to consider?
o The No Action Alternative
o This project also has a cluster component, which is a reconfiguration of
the project site.
o All alternatives must be considered
Attorney Sean Hopkins provided the following:
Site Background:
• The site is located at 4825 Big Tree Road and is zoned R-1 and C-2.
• The project site is 34 acres.
• Proposed use of a residential subdivision.
• Project requires Preliminary Plat Approval from the Planning Board.
• Proposed residential subdivision to occur on the portion of the Project Site zoned
R-1.
• R-1 zoning district expressly permits detached single-family dwellings per
Section 280-31A(2) of the Zoning Code
SEQRA and Project Review Process:
• Unlisted Action- Coordinated Environmental Review Conducted although not
required by SEQRA
• Planning Boad is designated Lead Agency pursuant to SEQRA
• Public hearing on the Draft Scoping Document held January 18, 2023
• Planning Board issued the Final Scoping Document on February 1, 2023
• DEIS with Appendices submitted on June 10, 2024, in accordance with the
requirements of the Final Scoping Document issued by the Planning Boad
• 45-day review period by the Planning Board of Completeness
• Planning Board determined that the DEIS was incomplete on July 24, 2024
• Submission of an updated DEIS addressing comments on August 20, 2024
• Informational session held by the Planning Board on August 21, 2024
• Revised DEIS submitted on August 30, 2024
• Notice of Completion of DEIS dated September 19, 2024
• Public Hearing on DEIS was held on October 2, 2024
• Public Comment period on DEIS expired on October 18, 2024
• Issuance of FEIS [Draft submitted on June 24, 2026]
• Issuance of Findings Statement and Preliminary Plat Decision by the Planning
Board
As-Of-Right Plan [Presented on July 24, 2024]:
6
Page 7
Town of Hamburg Planning Board Minutes July 15, 2026
• 67 lots for detached single family homes
• Minimum lot area of 15,000 sq-ft
• 6 lots along Parker Road frontage
• 2 lots for stormwater management only
Alterative As-Of-Right Plan [Presented on August 12, 2024]
• During the Planning Board meeting on July 24, 2024, a request was made
regarding providing a riparian buffer for the As-of-Right Plan
• 65 lots for detached single family homes [2 lots eliminated]
• Minimum lot area of 15,000 sq-ft
• 6 lots along Parker Road frontage
• 2 lots for stormwater management purposes only
Alternative Plan- Cluster Subdivision Layout:
• The Project Sponsor’s preference is to develop the Project Site as a clustered
residential subdivision consisting of 59 lots for detached single-family homes a
depicted on the Concept Site Plan [Drawing C-100]
• The clustered layout will result in a lower magnitude of environmental impacts
that the development of the Project Site pursuant to the As-of-Right subdivision
layout
• The area along Parker Road would consist of permanent green space that would
remain undeveloped
Clustered Subdivision Layout:
• Section 280-281 of the Zoning Code sets forth the following regulations that
apply to the cluster housing:
o A. To permit flexibility in land development through cluster development by
allowing for a variety of lot sizes without increasing the overall density
permitted in the zoning district(s) in which the property is located.
o B. To allow for residential development through cluster development which
is in harmony with the aesthetics qualities of the Town of Hamburg, and in
so doing protecting important and/or sensitive lands from development
(especially those that connect to other important Town features and will
provide large areas of important lands).
o C. To permit flexibility in residential lot layout that would improve public
health and safety aspects due to better layout of the subdivision.
o D. To minimize the development on non-local or minor streets.
o E. To meet the goals and objectives of the Town’s Comprehensive Plan
and any appropriate zoning overlay district.
7
Page 8
Town of Hamburg Planning Board Minutes July 15, 2026
• The clustering alternative is consistent with the above criteria for the following
reasons:
A. The density of clustered layout is less than the As-of-Right Plan [56 lots
versus 59 lots]
B. The clustered layout will preserve the jurisdictional federal wetlands on
the Project Site and the Parker Road frontage and provide a 50 ft. wide
riparian buffer for the protection of the Rush Creek tributary that bisects a
portion of the Project Site.
C. The lot layout will allow there to be 14.65 acres of permanent open
space to remain permanently undeveloped.
D. The clustered layout will result in a layout without any homes along the
Parker Road frontage of the Project Site.
E. The clustered layout is consistent with planning objectives contained in
the Town’s Comprehensive Plan.
Benefits of Clustered Subdivision Layout:
• Preserve the Parker Road frontage of the Project Site as Permanent Open
Space (total of 15.30 acres of Permanent Open Space proposed) and result in
six (6) fewer single-family homes (no homes along Parker Road frontage) than
the subdivision layout for a non-clustered residential subdivision.
• Project Sponsor will be establishing a riparian buffer with native plantings along
the portion of the existing stream that bisects a portion of the Project Site to be
developed. The Riparian Buffer Planting Plan was prepared by Earth
Dimensions, Inc. The riparian buffer to be established for the tributary of Rush
Creek will have a width of 25 ft. on each side of the tributary and will include 81
trees [5 types] and 66 shrubs [3 types]. The implementation of the plantings as
depicted on the Riparian Buffer Planting Plan will ensure the project does not
result in any significant adverse environmental impacts to the portion of the
tributary of Rush Creek located on the Project Site.
• Less traffic impacts as a result of 59 clustered lots instead of 65 lots [One
driveway onto Parkere Road with 2nd driveway is gated emergency access only]
• Clustered subdivision layout also includes an on-site recreational trail with a
length of 3,800 linear feet and will result in substantially less total impervious
surface (2,800 linear feet of roadway versus 4,100 linear feet) than if the Project
Site is developed pursuant to an As-of-Right layout based on the existing R-1
zoning classification consisting of sixty-seven (67) lots.
• Reduction of impervious surfaces is beneficial from a stormwater management
perspective.
• Less public infrastructure is beneficial to the Town from a fiscal perspective.
8
Page 9
Town of Hamburg Planning Board Minutes July 15, 2026
• Pursuant to the proposed clustered layout, the minimum lot size is 10,500 sq. ft.
and each of the lots will have a minimum depth of 140 ft. [smaller clustered lots
of 5,000 sq. ft. that have been utilized for other residential projects are not being
proposed] and Lot Layout Plan demonstrates that the homes will comply with
setback and provide a typical sized backyard that can accommodate decks,
patios, etc.
• Clustered layout is more consistent with existing community character.
• Clustered layout is preferred by nearby property owners.
Typical Lot Layout Plan- Clustered Subdivision:
• Lot sizes of 10,500 sq. ft. to more than 17,500 sq. ft.
• 75 ft x. 140 ft. minimum dimensions.
Wetland Impacts:
• There are not any wetlands subject to the jurisdiction of the NYSDEC on the
Project Site per Court decision issued on April 8, 2026.
• Wetland Permit issued by the USACE on May 21, 2026, authorizing impacts of
0.03 acres of federal wetlands on back of portion Lot No. 18.
Mitigation Summary:
• ECDSM- Ten (10) building lateral repairs are required by ECDSM.
• 14.65 acres of Permanent Open Space will be permanently protected via a
Declaration of Restrictions
• Berms along Parker Road frontage
• On-site walking trails
• 50 ft. Riparian Buffer for creek corridor protection
• Compliance with SWPPP requirements
Planning Department- Joshua Rogers
• SEQRA timelines, when you do a DEIS you have 45 days after you close the
public hearing or 60 days after the filing of the DEIS. This has obviously been
much longer. The applicant has been willing to waive those mandatory time
frames to have the Planning Board work on this.
• At this point the Planning Board is required to complete the FEIS.
• Currently the Planning Board is comparing from what the applicant has written in
the FEIS to whether or not the Planning Board aggress with what is presented.
• The final decision must be based on everything that has been submitted on the
record.
9
Page 10
Town of Hamburg Planning Board Minutes July 15, 2026
• This is also the time when the Planning Board can see if there are any other
additional studies that the applicant needs to provide before a decision can be
made.
Town Engineer Camie Jarrell added that in the role as Town Engineer, she is there to
support the Planning Board during the normal process. An EIS is a little outside the
normal process, so the Planning Board recommended the Town Board authorize GHD
to assist with the technical side of reviewing the DEIS.
Member Geraci stated that when this project was presented to the Planning Board
before, it was a very detailed and involved project. He added that the public hearing had
many people present that spoke, with the majority of them strongly in favor of seeing the
project complete with the housing.
Member Stewart asked what is the lot size difference between the clustering and the
As-of-Right?
Sean Hopkins stated that the clustering plan has a minimum lot size of 10,000 sq-ft and
a maximum lot size of 17,000 sq-ft. The As-of-Right plan is 15,000 sq-ft when served by
a public sewer with the frontage being 90 ft at the building line, and 30 ft at the front line.
Member Chmura stated in respect to the memo from Josh, there was a reference of the
Planning Board collecting the substantive comments. Does the Planning Board have
those now to review or are they still being collected?
Mr. Rogers responded that all substantive comments were made during the DEIS
process and have been provided to the Board.
Member Chmura asked what is the timing for this Board?
Mr. Rogers answered if the Applicant is willing to return on August 5, 2026, the Board
can go over any further comments, studies needed or clarification questions to be
addressed at that point. The overall objective is to be able to determine this FEIS as
complete, which has some filing notifications that the Planning Department will take
care of. Once that is done, the time clock starts again to issue SEQRA findings.
The Project was tabled to the August 5, 2026 Planning Board meeting.
Planning Board to discuss the draft Final Environmental Impact Statement
submitted by Wetzl Development LLC regarding a proposal by Glenn Wetzl to
rezone property located east and south of 4255 McKinley Parkway
Attorney Sean Hopkins appeared on behalf of the project.
Mr. Rogers provided the following background:
10
Page 11
Town of Hamburg Planning Board Minutes July 15, 2026
• This project has historically been reviewed concurrently with the Parker Road
Project. The DEIS’s have been reviewed at the same time, the public hearings
were held at the same time etc.
• This project also has a very long history, but an interesting caveat is that the
Planning Board is the lead agency, but there is a rezoning decision that needs to
be made by the Town Board.
• Similar to the Parker Road project, when the Planning Board does receive the
FEIS, it will follow the same kind of process where they are addressing all the
substantive comments that have been submitted
• There was a concern regarding wetlands impacts for this project which has now
been amended.
Attorney Sean Hopkins provided the following update:
Site Background:
• The site is located at 0 Big Tree Road Avenue and is zoned C-1 along the
frontage and then the remainder is zoned R-1.
• The project site is 42.5 acres.
• Proposed Use: Residential project consisting of apartments for lease with
attached garages.
• Project requires rezoning by the Town Board and Site Plan Approval from the
Planning Board.
• Positive Declaration issued by the Planning Board on September
• 15, 2021.
• Notice of Completion for DEIS issued on September 10, 2021.
SEQRA and Project Review Process:
• Unlisted Action- Coordinated Environmental Review Conducted although not
required by SEQRA
• Planning Board is designated Lead Agency pursuant to SEQRA
• Public Hearing on the Draft Scoping Document held by the Planning Board on
January 18, 2023
• Planning Board issued the Final Scoping Document on February 1, 2023
• DEIS with Appendices submitted on July 11, 2024, in accordance with the
requirements of the Final Scoping Document issued by the Planning Board
• 45-day additional review period by the Planning Board of Completeness
• Review of DEIS for Completeness received on August 15, 2024
• Submission of an updated DEIS addressing comments on September 8, 2024
• Notice of Completion dated September 10, 2024
11
Page 12
Town of Hamburg Planning Board Minutes July 15, 2026
• Public Hearing on the DEIS- October 2, 2024, and October 18, 2024
• Public Comment Period on the DEIS expired on October 18, 2024
• Preparation of FEIS
• Issuance of a Findings Statement by the Planning Board and rezoning
recommendation
• Town Board public hearing and rezoning decision
• Site Plan Approval from the Planning Board
Preferred Layout
• No roadway connections to Wilson Drive to Tomaka
• The project consists of 156 attached residential units for lease, along with all
related site improvements as depicted on the Concept Site Plan
o 94 single-family units with attached garages
o 56 two-story units with attached garages
o 330 parking spaces
o Clubhouse and playground
• The residential project includes a pending requested zoning amendment for 22.4
acres of the Project Site from C-1 Local Retail Business District and R-1 Single-
Family Residence District to R-3 Multifamily District
• 200 ft. setback from proposed R-3 zoning boundary to rear of closest lot on
Wilson Drive
• 20.1 acres of Permanent Open Space to be subject to a Declaration of
Restrictions
• On-site stormwater management system- Storm water system will not connect to
Wilson Drive
• Impacts to only 0.04 acres of the 7.52 acres of jurisdictional federal wetlands and
40 linear feet of tributary to Rush Creek. The USACE has authorized this minor
impact via the issuance of a Nationwide Permit No. 29 on May 11, 2023
Benefits of the Preferred Layout:
• 20.1 acres of Permanent Open Space to be protected by a Declaration of
Restrictions to be recorded at the Erie County Clerk’s Office and also subject to a
Conservation Easement to the Town of Hamburg
• Riparian buffer with native plantings along the portion of the tributary of Rush
Creek that bisects a portion of the Project Site to be developed
• Demand for upscale multifamily units for lease with attached garages
• Single-story units with attached garages are attractive to seniors who live in the
Town and want to downsize
12
Page 13
Town of Hamburg Planning Board Minutes July 15, 2026
• Substantially less traffic impacts than As-of-Right development of 16.4 acres of
the Project Site based on existing C-1 zoning classification
• No roadway connections to Wilson Drive or Tomaka as requested by residents
during project review process
• Minor wetland impact of only 0.04 acres [1/2 of 1% of the on-site jurisdictional
federal wetland- Nationwide Permit issued by the USACE on May 13, 2023]
• Reduction of impervious surfaces is beneficial from a stormwater management
perspective
• No on-site public infrastructure- Beneficial to the Town from a fiscal perspective
As-of-Right Alternative Plan
• Based on existing C-1 zoning and development of a portion of the R-1 zoned
property
• 18 lot residential subdivision
• Commercial component [16.4 acres]:
o 3 office buildings totaling 75,000 sq. ft.
o 2 commercial retail buildings totaling 42,800 sq. ft.
o 3 restaurants [2 with drive-thru facilities] totaling 9,925 sq. ft.
Residential Alternative
• Downzoning of 16.4 acres from C-1 to R-3 to accommodate 104 attached
multifamily units for lease with attached garages
• 18 lot residential subdivision on portion of the Project Site zoned R-1 with public
roadway connection to Wilson Road and Tomaka Drive intersection
• 0.30 acres impacts to 7.52 acres of jurisdictional federal wetlands
Proposed Zoning Conditions:
1. The Applicant shall convey a Conservation Easement to the Town of Hamburg for
the 20.1 acres of Permanent Open Space of the Project Site to remain zoned R-1
Single-Family Residence District (‘R-1’). The content of the Conservation
Easement shall be reviewed and approved by the Town Attorney’s Office prior to
recording at the Erie County Clerk's Office
2. A Declaration of Restrictions shall be recorded at the Erie County Clerk's Office.
The Declaration of Restrictions shall include language expressly stating there
shall not be any buildings, roadways or driveways constructed within the
Permanent Open Space including any roadway or driveway connections to the
portions of the Project Site with frontage on Wilson Road. The content of the
Declaration of Restrictions shall be reviewed and approved by the Town
Attorney’s Office prior to recording at the Erie County Clerk's Office
13
Page 14
Town of Hamburg Planning Board Minutes July 15, 2026
3. There shall not be any buildings located on the portion of the Project Site to be
rezoned R-3 Multifamily District (‘R-3’) located within two hundred feet (200’) of
the rear property line of the existing residential lots on Wilson Road
4. The on-site stormwater management to be installed in connection with the
residential project shall comply with the stringent stormwater quality and quantity
standards of the New York State Department of Environmental Conservation
including the handling of a 100-year storm event. Verification of compliance this
condition shall occur in connection the future review of a site plan application for
the proposed residential project.
Mr. Joshua Rogers added that this project follows a similar timeline as the previous
project (Parker Road subdivision). The main difference is that the SEQR findings will
also have a rezoning recommendation that will go to the Town Board. Should they
approve the rezoning recommendation, the project will return to the Planning Board for
Site Plan approval.
Town Engineer Camie Jarrell added that the other aspect that the two projects have in
common is that Rush Creek runs through them. As with the previous project, GHD did
some reviews and is available to help with finalizing the FEIS. An important factor that
was discussed in great detail by the Planning Board was that the Creek does bisect this
property. The Riparian Buffer will essentially continue with plantings and so forth.
Member Chmura stated for both projects, she asked for clarification on how they are to
read the verbiage regarding the layouts i.e. the verbiage lists the alternative as the
cluster, even though it is being presented as the preferred layout.
Mr. Hopkins informed the Board that Member Chmura is correct in that when this project
was originally reviewed the Planning Board at that time wanted the As-of-Right labeled
as the preferred plan.
Mr. Rogers informed the Planning Board that the project actually has three different
layouts for them to review.
• The As-of-Right is the Commercial/ Single-family subdivision
• Alternative (preferred) which is exclusively multifamily with greater green space
• Alternative two partially multifamily and also single-family subdivision that would
connect to Wilson Drive.
Member Chmura asked if the Planning Board is reviewing the mitigation measures
against each option?
Mr. Rogers explained that the Planning Board is doing a comparative of each option and
their impact.
14
Page 15
Town of Hamburg Planning Board Minutes July 15, 2026
The project was then tabled until the August 5, 2026 Planning Board meeting.
OTHER BUSINESS
Member Ryan made a motion, seconded by Member Geraci, to approve the following
minutes:
• July 1, 2026
As the vote on the motion was five (5) ayes the motion carried.
Member Quandt made a motion, seconded by Member Ryan, to adjourn the meeting.
Carried.
The meeting was adjourned at 8:21 P.M.
Respectfully submitted,
August Geraci, Secretary