Planning Board Regular Meeting, May 20, 2026 — Minutes

Government
Town of Hamburg
Board
Planning Board
Meeting
May 20, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Energy and data center siting, Housing, Roads and traffic, Budget and taxes, Public safety

Original document

Same meeting

Text · page 18 of 22

Read the whole document on one page (all 22 pages, each with its own heading)

Town of Hamburg Planning Board Minutes  May 20, 2026

company. This is unique because they are looking for a use variance from the Zoning
Board. They are before the Planning Board first because they are going to be the lead
agency and responsible for making a SEQR decision.

Mr. Rogers explained that after the Applicant gets a decision from the Zoning Board,
they would return to the Planning Board for a change of use and ultimately Site Plan
Approval. The Town Code states that if there is a decision between the Zoning Board
and the Planning Board, the Planning Board takes lead agency.

Mr. Rogers recommended the Planning Board conduct a coordinated review with the
DEC, if available, the owners of the railroads, and of course the Board may send it to
any other agencies they deem appropriate.

Mr. Rogers asked the Applicant to submit a Full Environmental Assessment Form, not
just the short form which had been submitted.

Town Engineer Camie Jarrell added for clarification to the Board, it looks as if the
property does not have road frontage, however, there is a public right-of-way. Currently,
the existing driveway that is shared zig zags throughout the public right-of-way to
service both buildings on this property. The applicant is going to redo the driveway and
bring it up to the new project. This would be within a public right-of-way. For
consideration, the Board would be allowing a private driveway to be upgraded and used
in a public right-of-way. As stated, there is already a driveway there so she can see
how that would be permitted.

Member Ryan asked if the Applicant would provide a HMA (Hazard Mitigation Analysis)?

The Applicant responded yes, it is their intent to do that as part of the site plan approval.

Member Ryan asked if the Applicant works with fire protection engineers on these types
of projects.

The Applicant responded yes, they typically work with a firm called ESRG, who are the
leaders in the field.

Member Ryan mentioned that the Applicant previously stated that once the fire has
started, it is a four hour burn out. She asked for clarification, is that four hours per cell
or four hours if a bunch go up in flames? How long could one expect a fire to last?

The Applicant answered that the most recent fire was in Warwick, and it was a total of
six hours before it went down. It is not that the batteries cannot be put out it is that they
are stored in cabinets that are watertight and you cannot get water onto them. The only
way to get water onto the batteries is to open the door and pull the trays out which
would be putting personnel in more danger.

  18