Town of Hamburg Planning Board Minutes  April 1, 2026

REGULAR MEETING

PLEDGE OF ALLEGIANCE

Cynthia Gronachan led the meeting attendees in the recitation of the Pledge of
Allegiance.

ROLL CALL

  Present:  Chair Gronachan, Member Clark, Member Geraci, Member Ryan
  Member Stewart, Member Chmura, and Member Zajac

  Absent:

  Staff:  Josh Rogers, Planning Department; Joseph Gogan, Planning
  Board Attorney; Camie Jarrell, Engineering Department

Coral Cottage Holiday Rental, LLC- Requesting Site Plan and Special Use Permit
Approval to operate a short-term rental at 3538 Heatherwood Drive

Withdrawn at the request of the Applicant.

Erie County Agricultural Society- Requesting Site Plan Approval for a proposal to
demolish three (3) structures and construct a 32,850+/- sq-ft one story building
within the existing Slade Park between the existing Fireman’s building and
Grange Building, to be located at 5600 McKinley Parkway

Doug Hutter of Zaxis Architectural appeared on behalf of the project. He is looking for
site plan approval for the project and the setting of a public hearing for May 5, 2026, on
behalf of the Erie County Agricultural Society.

Mr. Hutter explained that the project is to propose a new building for Slade Park which is
located in the middle of the Fairgrounds. This area currently contains the Fireman’s
Building, New York State Police Building, the rappelling tower, a marketplace building,
the Grange Building, and the Historical Building. Most of the buildings are used all year
long with the exception of the Fireman’s Building and the Historical Building.

The Fairgrounds are proposing to construct a new building that will replace some of the
existing structures. They are looking to build a 32,850 sq-ft facility that will help with
large events such as Plantasia but also be used for events that do not need a building
as large as the Event Center (70,000 sq-ft).