Text · page 169 of 201
Read the whole document on one page (all 201 pages, each with its own heading)
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration. GENERAL NOTES: DRAWING KEYNOTES: # All Rights Reserved. Reuse of these documents without the expressed written permission of Carmina Wood Design is prohibited. WARNING it is a violation of article 145 A. REFER TO CIVIL PLANS FOR EXACT CONDUIT ROUTING AND PATHWAYS. SIZE OF CIRCUITRY 1. DUAL PORT CHARGING STATION: PROVIDE LEVEL 2 CHARGER AND POWER FROM 40A-2P CIRCUIT AND EQUIPMENT AND DEVICE LOCATIONS ARE SHOWN ON THIS PLAN. BREAKER IN PANEL LP-1 VIA 2#8 & 1#8G IN 2"C. CONDUIT SHALL BE SAND BED ENCASED. B. ROUTING OF UNDERGROUND ELECTRIC IS DIAGRAMMATIC. FIELD COORDINATE EXACT 2. PROVIDE 3/4"X10' GROUND ROD AND BOND TO GENERATOR GROUND BUS WITH #2/0 WIRE. ROUTING. 3" CONDUITS 3. PROVIDE GROUNDING GRID. REFER TO DETAIL '5' ON E-400 FOR ADDITIONAL REQUIREMENTS. C. ALTHOUGH EVERY ATTEMPT HAS BEEN MADE TO INDICATE EXISTING UTILITIES AS A A S 4" CONDUITS 4" CONDUITS ACCURATELY AS POSSIBLE FROM EXISTING SURVEYS, DRAWINGS AND OTHER DATA; OTHER 4. FOR THE INDICATED FIXTURES, AS A PART OF BASE BID, PROVIDE EMPTY 1"C WITH PULLSTRING TO A S UTILITIES MAY BE PRESENT OR PLACED IN DIFFERENT LOCATIONS. VERIFY EXACT LOCATION EACH LOCATION FROM THE ELECTRIC ROOM. COORDINATE FINAL FIXTURE LOCATION WITH SITE 4 OF EXISTING UTILITIES BY TEST HOLES AND/OR SITE INVESTIGATIONS. NOTIFY "DIG/SAFELY" CONTRACTOR. AS A PART OF ALTERNATE BID #1, INSTALL THE INDICATED FIXTURES COMPLETE. A A TO LOCATE ALL EXISTING UNDERGROUND UTILITIES PRIOR TO COMMENCEMENT OF SITE CIRCUIT TO SITE LIGHTING CIRCUIT IN PANEL LP-1, 20A-2P CIRCUIT BREAKER; CIRCUIT NUMBER 27,29. WORK. 5. FOR THE INDICATED FIXTURES AS A PART OF BASE BID, EXTEND EMPTY CONDUIT WITH PULLSTRING AS D. HAND EXCAVATE WHERE CROSSING EXISTING UNDERGROUND UTILITIES. SHOWN AND ABANDON UNDERGROUND. AS A PART OF ALTERNATE #2, INSTALL THE INDICATED FIXTURES COMPLETE. CIRCUIT TO SITE LIGHTING CIRCUIT IN PANEL LP-1, 20A-2P CIRCUIT BREAKER; E. FIELD VERIFY LOCATION OF NEW ELECTRICAL EQUIPMENT BEFORE INSTALLATION WITH CIRCUIT NUMBER 20,22. EXTEND/REROUTE CIRCUITRY PROVIDED IN BASE BID POWERING FIXTURES OWNER. INDICATED BY NOTE 6. GENERAL DETAIL NOTES: GENERAL DETAIL NOTES: F. PROVIDE NYLON PULL CORD IN ALL SPARE CONDUITS FOR PULLING OF FUTURE CABLING. 6. AS A PART OF BASE BID, INSTALL THE INDICATED FIXTURES COMPLETE. CIRCUIT TO SITE LIGHTING CIRCUIT IN PANEL LP-1 VIA 2#8 & 1#8G IN 1"C FROM 20A-2P CIRCUIT BREAKER; CIRCUIT NUMBER 20,22. • A = ACTIVE CONDUIT • A = ACTIVE CONDUIT GENERAL DETAIL NOTES: G. ALL EXCAVATION, BACKFILL, AND SITE RESTORATION SHALL BE PART OF THE ELECTRICAL • S = SPARE (EMPTY) CONDUIT • S = SPARE (EMPTY) CONDUIT WORK CONTRACT. 7. REMOVE INDICATED POWER/LIGHT POLE. REMOVE ASSOCIATED OVERHEAD CONDUCTORS BACK TO EXISTING TO REMAIN POWER POLE. PROVIDE NEW SECONDARY CONDUCTORS UNDERGROUND FROM CONDUITS (ACTIVE AND SPARE) SHALL BE SAND BED ENCASED. REFER TO • A = ACTIVE CONDUIT H. SITE LIGHTING LOCATIONS ARE SHOWN FOR REFERENCE ONLY, COORDINATE FINAL POLE MOUNTED TRANSFORMERS TO THE OUTBUILDINGS AS INDICATED ON THE DRAWINGS. CONDUITS (ACTIVE AND SPARE) SHALL BE SAND BED ENCASED. REFER TO DETAIL #3 ON E-400 FOR INSTALLATION REQUIREMENTS. DETAIL #3 ON E-400 FOR INSTALLATION REQUIREMENTS. LOCATIONS WITH SITE CONTRACTOR. PROVIDE CIRCUITRY AS CALLED AS NOTED. CONDUITS SHALL BE SAND BED ENCASED. REFER TO DETAIL #3 ON E-400 FOR 8. PROVIDE NEW CONCRETE ENCASED DUCT BANK FROM EXISTING POLE WITH TRANSFORMERS TO INSTALLATION REQUIREMENTS. EXISTING POLE WITH 300A MCB 208/120V PANEL MOUNTED TO IT. PROVIDE 2 PARALELLED SETS OF 4#500 & #2G IN 3-1/2"C FROM EXISTING POLE MOUNTED TRANSFORMER TO POLE MOUNTED PANEL VIA NEW CONCRETE ENCASED DUCT BANK. SECONDARY FEEDER DUCTBANK SECTION PRIMARY FEEDER DUCTBANK SECTION TELECOM FEEDER DUCTBANK SECTION 9. AS A PART OF BASE BID, INSTALL THE INDICATED FIXTURES COMPLETE. CIRCUIT TO SITE LIGHTING 2 NTS 3 NTS 4 NTS CIRCUIT IN PANEL LP-1 VIA 2#8 & 1#8G IN 1"C FROM 20A-2P CIRCUIT BREAKER; CIRCUIT NUMBER 27,29. 10. PROVIDE POWER FOR SITE PUMP TANK FROM PANEL LP-1 VIA 2#3 & #3G IN 1-1/4"C FROM 15A-2P CIRCUIT BREAKER; CIRCUIT NUMBER AS INDICATED. 11. PROVIDE POWER FOR SITE GRINDER PUMP FROM PANEL LP-1 VIA 2#4 & #4G IN 1-1/4"C FROM 15A-2P CIRCUIT BREAKER; CIRCUIT NUMBER AS INDICATED. 4 Town of Hamburg Community Center EXISTING 1 STORY BUILDING 1 2 3 4 5 6 7 8 4 A 1" CONDUIT CONDUITS: Hamburg, New York 14075 GENERAL DETAIL NOTES: 1. 2"C FOR CONTROL WIRING FOR GENERATOR REMOTE ANNUNCIATOR PANEL. 2. 1"C FOR ATS CONTROL WIRING. Bid/Permit Set • A = ACTIVE CONDUIT © Carmina Wood Design 3. 1-1/4"C FOR ATS-OS EMERGENCY POWER FEEDER. 2982 Lakeview Road CONDUITS SHALL BE SAND BED ENCASED. REFER TO 4. 1"C FOR ATS-LS EMERGENCY POWER FEEDER. DETAIL #3 ON E-400 FOR INSTALLATION REQUIREMENTS. 5. 1/2"C FOR GENERATOR BATTERY CHARGER. REFER TO DETAIL 3 ON E-300 4 9 FOR ADDITIONAL REQUIREMENTS. 6. 1/2"C FOR GENERATOR BATTERY HEATER. REFER TO DETAIL 3 ON E-300 FOR ADDITIONAL REQUIREMENTS. 7. 1/2"C FOR GENERATOR ALTERNATOR STRIP HEATER. REFER TO DETAIL 3 ON E-300 FOR ADDITIONAL REQUIREMENTS. LIGHT POLE FEEDER DUCTBANK SECTION 8. 1/2"C FOR GENERATOR BLOCK HEATER. REFER TO DETAIL 3 ON E-300 FOR 5 NTS ADDITIONAL REQUIREMENTS. CONDUITS SHALL BE SAND BED ENCASED. REFER TO DETAIL #3 ON E-400 FOR 02/05/2026 03/18/2026 04/14/2026 08/24/2026 INSTALLATION REQUIREMENTS. EXISTING POWER POLE WITH POLE Date 4 8 MOUNTED TRANSFORMERS SECONDARY FEEDER DUCTBANK SECTION E-001 6 NTS EXISTING POWER 7 7 POLE WITH POLE MOUNTED PANEL EXISTING DO NOT 1 ENTER 9 1 POWER POLE 8 No. Description 2 9 GENERAL NOTES: RFP #01 RFP #05 RFI-018 CCD #1 REVISIONS: 4 A. ALL EQUIPMENT SUPPLIED BY ELECTRICAL CONTRACTOR 4 2 SHALL BE APPROVED BY ENGINEER PRIOR TO PURCHASE. 5 9 11 11 11 6 6 6 1 2 3 4 10 3 11 4 4 4 KEYED NOTES: X STOP STOP 1. EXISTING POLE TO REMAIN. 4 E-001 2. EXISTING TOP CROSS ARM TO REMAIN. PROVIDE LOWER 6 CROSS ARMS TO SUPPORT HOOK SWITCH DISCONNECT. 5 6 12 LOWER CROSS ARMS SHALL BE SAME DIMENSION AS TOP 9 ft 7 CROSS ARM. 08/08/2025 3. PROVIDE HOOK STICK DISCONNECT, S&C SMD-20 OR APPROVED EQUAL. MAINTIAN CLEARANCE BETWEEN PHASES OF EXISTING OVERHEAD LINE. GYM 4. PROVIDE 5.1KV MCOV/40K DUTY CYCLE SURGE ARRESTOR. 5 Sealed: MOUNT TO POLE. E-001 1 13 9 9 9 5. #2/0 GROUND WIRE DOWN LEAD FROM LIGHTNING ARRESTOR TO GROUND RODS. 5 6. PROVIDE GROUND WIRE SLEEVE 15' AFG. PROPOSED COMMUNITY CENTER 3 20,050± SF 4 F.F.E. = 768.40 6 2 7. PROVIDE #2/0 CONNECTION TO PIPE CLAMP ON BOTH ACTIVE & SPARE CONDUIT. 10 6 8. 5/8 X 8'-0" GROUND ROD WITH GROUND CLAMP. 11 APPROXIMATE LOCATION OF 9. OVERHEAD CONDUCTORS, INSULATORS AND ASSOCIATED ELECTRIC ROOM 4 3 3 2 10 10 HARDWARE. E-001 DRAWING NAME: 34,36 4 4 10 10. CONDUCTORS FROM OVERHEAD TO CUSTOMER SERVICE TRANSFORMER VIA HOOK STICK SWITCHES. 6 2 1 SITE PLAN - ELEC E-001 E-001 1 11. WIRING TO LIGHTNING ARRESTOR. 10 12 12. CABLE GROUND TO DOWN LEAD. 2 GENERATOR 26,28 30,32 7' 33,35 12 CUSTOMER 13. TWO 5"C; ONE ACTIVE & ONE SPARE. BUILDING OWNED 3' MIN 3' MIN 8 3 6 TRANSFORMER POLE (E) 5 E-001 Date: 08/08/2025 Drawn By: SAS 8 Checked By: RPP DRAWING NO. CUSTOMER POLE DETAIL 7 NTS SITE PLAN - ELEC E-001 Project No: 24-6059 1 1" = 40'-0" 169