Text · page 168 of 201
Read the whole document on one page (all 201 pages, each with its own heading)
c. Provide duct bank, conduit and wire per electrical plan. D. Revised Septic layout due to high ground water 1) Refer to Sheets C-200, C-400, C-403, C-404 & E-001. a. Construct septic mound on existing grade per plans. b. Provide new grinder pump and tank. c. Provide wire and conduit to two pumps from electrical room. Issued By: Alex Farrell, AIA Attachments: E-001 – Rev #4 - Dated 08/24/2026 – Site Plan – Elec E-002 – Rev #1 – Dated 08/24/2026 – Site Plan – Elec South C-200 – Rev #3 – Dated 09/22/2026 – Grading Plan C-400 – Rev #6 – Dated 09/22/2026 – Utility Plan C-403 – Rev #3 – Dated 09/22/2026 – Septic System Details C-404 – Rev #5 – Dated 09/22/2026 – Septic System Details 168