Southtowns Record

Town Board Regular Meeting Agenda, Aug 24, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Aug 24, 2026
Kind
Agenda
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Zoning and land use, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 10 of 106

Read the whole document on one page (all 106 pages, each with its own heading)

f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No
  combustion, waste incineration, or other processes or operations?
If Yes, identify:
  i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
  ______________________________________________________________________________________________________
  ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
  ______________________________________________________________________________________________________

iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating)
  ______________________________________________________________________________________________________
g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility  Yes  No
  Permit, Title IV Permit or Title V Permit?
If Yes:
i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration  Yes  No
  requirements discussed in 6 NYCRR Part 231?
ii. As calculated in the air permit application, the proposed action has the potential to emit:
    Tons/year (short tons) of carbon monoxide (CO)
    Tons/year (short tons) of oxides of nitrogen (NOx)
    Tons/year (short tons) of particulate matter (PM-10, PM-2.5)
    Tons/year (short tons) of volatile organic compounds (VOC)
    Tons/year (short tons) of sulfur dioxide (SO2)
iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major  Yes  No
  source thresholds?
iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air  Yes  No
  pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))?
  If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________

h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane,
  nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide
  equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and
  global warming potentials provided in 6 NYCRR Part 496)?  Yes  No
 If Yes:
 i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric):
ii. Describe any greenhouse gas capture, control, or elimination measures included in project design:

i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as  Yes  No
  quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):

j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial  Yes  No
  new demand for transportation facilities or services?
If Yes:
  i. When is the peak traffic expected (Check all that apply):  Morning  Evening  Weekend
  Randomly between hours of  to  .
  ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks):

 iii. Parking spaces:  Existing  Proposed  Net increase/decrease
 iv. Does the proposed action include any shared use parking?  Yes No
 v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
  ______________________________________________________________________________________________________________
vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?  Yes  No
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric  Yes  No
  or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing  Yes  No
  pedestrian or bicycle routes?

  Page 7 of 15  FEAF 2026
  10