Text · page 12 of 106
Read the whole document on one page (all 106 pages, each with its own heading)
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No of solid waste (excluding hazardous materials)? If Yes: i. Describe any solid waste(s) to be generated during construction or operation of the facility: Construction: tons per (unit of time) Operation : tons per (unit of time) ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste: Construction: Operation: iii. Proposed disposal methods/facilities for solid waste generated on-site: Construction: Operation: s. Does the proposed action include construction or modification of a solid waste management facility? Yes No If Yes: i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or9 9 other disposal activities): ii. Anticipated rate of disposal/processing: Tons/month, if transfer or other non-combustion/thermal treatment, or Tons/hour, if combustion or thermal treatment iii. If landfill, anticipated site life: years t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No waste? If Yes: 9 9 i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents: 9 v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide name and location of facility:________________________________________________________________________ If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: 9 9 9 Page 9 of 15 FEAF 2026 12