Southtowns Record

Town Board Regular Meeting Agenda, Aug 24, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Aug 24, 2026
Kind
Agenda
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Zoning and land use, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 15 of 106

Read the whole document on one page (all 106 pages, each with its own heading)

v. Is the project site subject to an institutional control limiting property uses?  9 Yes9  No
   If Yes, DEC site ID number:
   Describe the type of institutional control (e.g., deed restriction or easement):
   Describe any use limitations:
   Describe any engineering controls:
   Will the project affect the institutional or engineering controls in place?  9 Yes9  No
   Explain:

E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site?  feet
b. Are there bedrock outcroppings on the project site?  9 Yes9  No
If Yes, what proportion of the site is comprised of bedrock outcroppings?  %
c. Predominant soil type(s) present on project site:  %
  ________________________  _________%
  ________________________  _________%
d. What is the average depth to the water table on the project site? Average:  feet

e. Drainage status of project site soils: 9 Well Drained:  % of site
  9 Moderately Well Drained:  % of site
  9 Poorly Drained  % of site
 f. Approximate proportion of proposed action site with slopes: 9 0-10%:  % of site
  9 10-15%:  % of site
  9 15% or greater:  % of site
g. Are there any unique geologic features on the project site?  9  9
  Yes  No
 If Yes, describe:

h. Surface water features.
  i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,  9 Yes 9 No
  ponds, or lakes)?
 ii. Do any wetlands or other waterbodies adjoin the project site?  9 Yes  No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,  9 Yes  No
  state or local agency?
 iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
   Streams:  Name  Classification
  •  Lakes or Ponds: Name  Classification
  • Wetlands:  Name  Approximate Size
  • Wetland No. (if regulated by DEC)
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired  9 Yes9  No
  waterbodies?
If Yes, name of impaired water body/bodies and basis for listing as impaired:

i. Is the project site in a designated Floodway?  9  9
  Yes  No
j. Is the project site in the 100-year Floodplain?  9  9
  Yes  No
  9  9
k. Is the project site in the 500-year Floodplain?  Yes  No
  9  9
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer?  Yes  No
 If Yes:
  i. Name of aquifer:

  Page 12 of 15  FEAF 2026
  15