Southtowns Record

Town Board Regular Meeting Agenda, Aug 24, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Aug 24, 2026
Kind
Agenda
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Zoning and land use, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 68 of 106

Read the whole document on one page (all 106 pages, each with its own heading)

e. Will the proposed action be constructed in multiple phases?  9✔ Yes 9 No

  i. If No, anticipated period of construction:  months
  ii. If Yes:
   Total number of phases anticipated  2

   Anticipated commencement date of phase 1 (including demolition)  Aug
  month 2026  year
   Anticipated completion date of final phase  Sep
  month 2026  year
   Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
  determine timing or duration of future phases:  9  9
Phase 1 includes placing of the turf football field, lighting, and the fence, and some of the temporary structures. Phase
2 will consist of completion of all other elements.
f. Does the project include new residential uses?  Yes ✔ No
If Yes, show numbers of units proposed.
  One Family  Two Family  Three Family  Multiple Family (four or more)  9  9
Initial Phase
At completion
  of all phases
  9  9  9
g. Does the proposed action include new non-residential construction (including expansions)?  Yes ✔ No
If Yes,
  i. Total number of structures
  ii. Dimensions (in feet) of largest proposed structure:  height;  width; and  length
 iii. Approximate extent of building space to be heated or cooled:  square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any  Yes ✔ No
  liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
  i. Purpose of the impoundment:
 ii. If a water impoundment, the principal source of the water:  Ground water Surface water streams 9 Other
  9 specify:

iii. If other than water, identify the type of impounded/contained liquids and their source.

 iv. Approximate size of the proposed impoundment.  Volume:  million gallons; surface area:  acres
  v. Dimensions of the proposed dam or impounding structure:  height;  length
 vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):

D.2. Project Operations
 a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?  Yes ✔ No
  (Not including general site preparation, grading or installation of utilities or foundations where all excavated
  materials will remain onsite)
 If Yes:
  i .What is the purpose of the excavation or dredging?
  ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
    Volume (specify tons or cubic yards):  9  9
    Over what duration of time?
 iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.

  iv. Will there be onsite dewatering or processing of excavated materials?  Yes No
  If yes, describe.  9  9

  v. What is the total area to be dredged or excavated?  acres
  vi. What is the maximum area to be worked at any one time?  acres
 vii. What would be the maximum depth of excavation or dredging?  feet
 viii. Will the excavation require blasting?  Yes  No
 ix. Summarize site reclamation goals and plan:

  Page 4 of 15  FEAF 2026
  68