Southtowns Record

Town Board Regular Meeting Agenda, Aug 24, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Aug 24, 2026
Kind
Agenda
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Zoning and land use, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 72 of 106

Read the whole document on one page (all 106 pages, each with its own heading)

k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand?  ✔  Yes  No
 If Yes:
  i. Estimate annual electricity demand during operation of the proposed action:

 ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
  other):________________________________________________________________________________________________
National Grid connection for lighting/power

 iii. Will the proposed action require a new, or an upgrade, to an existing substation?  Yes ✔ No

 l. Hours of operation. Answer all items which apply.
  i. During Construction:  ii. During Operations:
   Monday - Friday: 7 am to 7 pm    Monday - Friday:  Dawn to Dusk

   Saturday:  7 am to 7 pm
    Saturday:  Dawn to Dusk

   Sunday:    Sunday:  Dawn to Dusk

   Holidays:    Holidays:  Dawn to Dusk

 m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction,  ✔  Yes  No
  operation, or both?
 If yes:
 i. Provide details including sources, time of day and duration:
Temporary noise from construction, associated event noise during event days and weekends
 ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen?  Yes ✔ No
  Describe:

 n. Will the proposed action have outdoor lighting?  ✔  Yes  No
  If yes:
  i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
8 foot dark sky compliant lamps sprawled around the Park
 ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen?  Yes ✔ No
  Describe:

 o. Does the proposed action have the potential to produce odors for more than one hour per day?  Yes ✔ No
 If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
  occupied structures:

 p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)  Yes ✔ No
  or chemical products 185 gallons in above ground storage or any amount in underground storage?
 If Yes:
  i. Product(s) to be stored
  ii. Volume(s)  per unit time  (e.g., month, year)
 iii. Generally, describe the proposed storage facilities:

 q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides  Yes ✔ No
  (i.e., herbicides, insecticide) during construction or operation?
 If Yes:
  i. Describe proposed treatment(s):

  ii. Will the proposed action use Integrated Pest Management Practices?  Yes  No

  Page 8 of 15  FEAF 2026
  72