Owner Architect Contractor Contractor Change Order Field Hamburg Senior and Community Center Other 2982 Lakeview Road Change Order 1 RFP 1 - Electrical Fixtures Changes Hamburg, New York 14075 Initial Date: 5/5/2006 Contract for: Electrical Contractor CIR Electrical 2517 Long Rd. Grand Island, NY 14072 Description of work to be charged to Contract is as follows: CIR to provide & install (19) new L10 exterior gooseneck fixtures as per RFP-001. Pricing also includes the removal of (4) L4 fixtures from the scope of work, and the addition of (1) L1 fixture in multi-purpose room 128. Not valid until signed by Owner, Architect and Contractor The original Contract Value $1,136,100.00 Net contract changes previously authorized: $0.00 Charges to Contract Amount as a result of this authorization: $26,601.70 Current Contract Amount, including this Change: $1,162,701.70 CM: Square Engineering Contractor: CIR Electrical Architect: Town of Hamburg Jake Morley Jordan Cialone Camie Jarrell Date: Date: Date: square engineering — 39