Text · page 41 of 62
Read the whole document on one page (all 62 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
2517 Leng Rd. Grand Island, NY 14072 CHANGE ORDER REQUEST RECAP Job Name: Hamburg Senior Community Center Date: 4/2/2026 Contract No.: 2025-03E Change Order Regest No.: 2 CIR Job No.: 2502019 Description: CIR to provide (3) pole mounted fused cutouts with associated fuses sized for the service to the new community center building. CIR to hire a subcontractor to install these new fuses and to provide & install all remaining overhead infrastructure & terminations. This price is contingent upon the engineer's approval of the fuses as submitted. Material Description Material _| Labor Description Hours Rate Labor Cost Attached Takeoff Sheet $ 4,942.81 | Foreman ST 7 $ - $ - Zang Quote #26-0422 (Freight cost shown below) $ 5,700.00 | Journeyman ST 9.0}$ 92.16}$ 829.44 Foreman PT - $ “ Journeyman PT - $ - $ = $ - $ - $ - $ 7 Material Cost Subtotal: $ 10,642.81 $ = Job Expenses: Supervision (12.5%) 1.125] $ - $ - Document Control Tool Usage (4% of Labor) $ - Travel Time Costs Total Labor Costs: $ 829.44 Telephone SUBTOTAL(L+M+JE) $ 11,472.25 ‘Transportation Research & Layout 0% $ - Storage / Warehouse Material Handling 4% $ 458.89 Safety (3% of Labor Cost) $ - Clean Up Costs: 0% $ - Inspections & Permits Record Drawings Fuel Surcharges (4% of Material Cost) $ - SUBTOTAL: $ 11,931.14 '26 -'27 Wage Rate Increase $ - Overhead 10% $ 1,193.11 Total Job Expenses $ - Profit 5% $ 656.21 Qualifications & Clarifications: Subcontractor (Spurline Quote #SLCCIR-0033026) $ 12,310.00 1.) Sales Tax is NOT included Subcontractor Mark-up 15% $ 1,846.50 2.) Straight Time only-NO overtime included TOTAL: $ 27,936.97 3.) No cutting and patching included Tax on Total - $ - 4.) Schedule Impact Bond Cost 2% $ 419.05 Change Order Request Total $ 28,356.02 We reserve the right to correct any and all errors and omissions 41