Text · page 42 of 62
Read the whole document on one page (all 62 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Description Quantity Price Unit Net Cost DB Labor Labor Labor Unit Total Material Total Hours 3/4" CONDUIT - PVC80 30 Cc $62.51 5.25 5.25 $18.75 1,58 3/4" END BELL - PVC 2 $323.50 6.25 6.25 $6.47 0.13 mmmBza0 mmmeZ00 3/4" 2-H STRAP - PVC. 5 $90.54 7.50 7.50 $4.53 0.38 #2/0 BARE COPPER 60 $3,828.02 26.25 26.25 $229.68 1.58 5/8"x 10' CU CLAD GRD ROD $116.54 1.25 1.25 $233.08 2.50 #4-#4/0TO4 -5" PIPE GRD CLAMP $227.79 0.50 0.50 $455.58 1.00 2x #2/0 SOL - #250 CU GRDG CONN TO 5/8 - 3/4" OD ROD/PIPE $66.73 0.31 0.31 $266.92 1.24 #10x 1 1/2 WOOD SCREW $5.46 4.25 4.25 $0.55 Oo 0.42 0 2 1/2" CONDUIT - PVC80 1400 $244.21 0.00 0.00 $3,418.94 0.00 oo oo 2 1/2" ELBOW 90 DEG - PVC80 10 $3,083.10 0.00 0.00 $308.31 0.00 Totals $4,942.81 8.83 42