Southtowns Record

Town Board Regular Meeting Agenda, Apr 27, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Apr 27, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Parks and recreation, Public safety, Roads and traffic

Original document

Same meeting

Text · page 97 of 105

Read the whole document on one page (all 105 pages, each with its own heading)

Agency Use Only [IfApplicable]
  Project : Briad Development Southwestern and Big Tree Traveler Ce
  Date : 4/13/2026

  Full Environmental Assessment Form
  Part 3 - Evaluation of the Magnitude and Importance of Project Impacts
  and
  Determination of Significance

 Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question
 in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular
 element of the proposed action will not, or may, result in a significant adverse environmental impact.

 Based on the analysis in Part 3, the lead agency must decide whether to require an environmental impact statement to further assess
 the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not
 have a significant adverse environmental impact. By completing the certification on the next page, the lead agency can complete its
 determination of significance.

 Reasons Supporting This Determination:
 To complete this section:
  • Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity,
  size or extent of an impact.
  • Assess the importance of the impact. Importance relates to the geographic scope, duration, probability of the impact
  occurring, number of people affected by the impact and any additional environmental consequences if the impact were to
  occur.
  • The assessment should take into consideration any design element or project changes.
  • Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where
  there is a need to explain why a particular element of the proposed action will not, or may, result in a significant adverse
  environmental impact.
  • Provide the reason(s) why the impact may, or will not, result in a significant adverse environmental impact
  • For Conditional Negative Declarations identify the specific condition(s) imposed that will modify the proposed action so that
  no significant adverse environmental impacts will result.
  • Attach additional sheets, as needed.
The analysis completed for Part 2 included use of the following studies or analyses provided by the Applicant:

-Planning Board Rezoning Report
-Site Survey
-Proposed Site Plan
-Circulation Plan
-FEMA Flood Map
-Wetland Delineation Plan
-Safety Systems and Regulatory Controls at Modern Fueling Facilities Memo
-Official Agency Comments from Coordinated Review
-SHPO Letter of No Concern
-ITE Trip Generation Analysis

Please find the attached Part 3 analysis as the basis for why this project should be issued a Negative Declaration.

  Determination of Significance - Type 1 and Unlisted Actions
 SEQR Status:  † Type 1  †
  ✔ Unlisted

 Identify portions of EAF completed for this Project: †
  ✔ Part 1  †
  ✔ Part 2  †
  ✔ Part 3  97
  FEAF 2019