Text · page 27 of 79
Read the whole document on one page (all 79 pages, each with its own heading)
C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 9 Yes 9 No ✔ If Yes, what is the zoning classification(s) including any applicable overlay district? C-3 _________________________________________________________________________________________________________ _________________________________________________________________________________________________________ b. Is the use permitted or allowed by a special or conditional use permit? 9 Yes 9 No c. Is a zoning change requested as part of the proposed action? ✔9 Yes 9 No If Yes, i. What is the proposed new zoning for the site? NC and R-3 ___________________________________________________________________ C.4. Existing community services. a. In what school district is the project site located? Frontier ________________________________________________________________ CSD and Hamburg CSD b. What police or other public protection forces serve the project site? _________________________________________________________________________________________________________ Hamburg Police and Erie County Sheriff's c. Which fire protection and emergency medical services serve the project site? All __________________________________________________________________________________________________________ Fire Districts in the Hamburg WRA d. What parks serve the project site? __________________________________________________________________________________________________________ All parks in the Hamburg WRA __________________________________________________________________________________________________________ D. Project Details D.1. Proposed and Potential Development a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all components)? _________________________________________________________________________________________________________ b. a. Total acreage of the site of the proposed action? _____________ acres b. Total acreage to be physically disturbed? _____________ acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? _____________ acres c. Is the proposed action an expansion of an existing project or use? 9 Yes 9 No i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units, square feet)? % ____________________ Units: ____________________ d. Is the proposed action a subdivision, or does it include a subdivision? 9 Yes 9 No If Yes, i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types) ________________________________________________________________________________________________________ ii. Is a cluster/conservation layout proposed? 9 Yes 9 No iii. Number of lots proposed? ________ iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________ e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No i. If No, anticipated period of construction: _____ months ii. If Yes: • Total number of phases anticipated _____ • Anticipated commencement date of phase 1 (including demolition) _____ month _____ year • Anticipated completion date of final phase _____ month _____year • Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: _______________________________________________________________ ____________________________________________________________________________________________________ ____________________________________________________________________________________________________ Page 3 of 13 27