f. Does the project include new residential uses?  9 Yes 9 No
If Yes, show numbers of units proposed.
  One Family  Two Family  Three Family  Multiple Family (four or more)
Initial Phase  ___________  ___________  ____________  ________________________
At completion
  of all phases  ___________  ___________  ____________  ________________________

g. Does the proposed action include new non-residential construction (including expansions)?  9 Yes 9 No
If Yes,
  i. Total number of structures ___________
  ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
 iii. Approximate extent of building space to be heated or cooled: ______________________ square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any  9 Yes 9 No
  liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
  i. Purpose of the impoundment: ________________________________________________________________________________
 ii. If a water impoundment, the principal source of the water:  9 Ground water 9 Surface water streams 9 Other specify:
  _________________________________________________________________________________________________________
iii. If other than water, identify the type of impounded/contained liquids and their source.
  _________________________________________________________________________________________________________
 iv. Approximate size of the proposed impoundment.  Volume: ____________ million gallons; surface area: ____________ acres
  v. Dimensions of the proposed dam or impounding structure:  ________ height; _______ length
 vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
  ________________________________________________________________________________________________________

D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? 9 Yes 9 No
  (Not including general site preparation, grading or installation of utilities or foundations where all excavated
  materials will remain onsite)
If Yes:
  i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
  • Volume (specify tons or cubic yards): ____________________________________________
  • Over what duration of time? ____________________________________________________
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________
  iv. Will there be onsite dewatering or processing of excavated materials?  9 Yes 9 No
  If yes, describe. ___________________________________________________________________________________________
  ________________________________________________________________________________________________________
  v. What is the total area to be dredged or excavated? _____________________________________acres
 vi. What is the maximum area to be worked at any one time? _______________________________ acres
vii. What would be the maximum depth of excavation or dredging? __________________________ feet
viii. Will the excavation require blasting?  9 Yes 9 No
ix. Summarize site reclamation goals and plan: _____________________________________________________________________
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________

b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment 9 Yes 9 No
  into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
  i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
  description): ______________________________________________________________________________________________
  _________________________________________________________________________________________________________

  Page 4 of 13