Southtowns Record

Town Board Regular Meeting Agenda, Mar 23, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Mar 23, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Parks and recreation, Budget and taxes, Public safety, Roads and traffic

Original document

Same meeting

Text · page 29 of 79

Read the whole document on one page (all 79 pages, each with its own heading)

ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
  alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
  _________________________________________________________________________________________________________
  _________________________________________________________________________________________________________
  _________________________________________________________________________________________________________
  _________________________________________________________________________________________________________
iii. Will the proposed action cause or result in disturbance to bottom sediments?  Yes 9 No
  If Yes, describe: __________________________________________________________________________________________
 iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation?  9 Yes 9 No
  If Yes:
  • acres of aquatic vegetation proposed to be removed: ___________________________________________________________
  • expected acreage of aquatic vegetation remaining after project completion:________________________________________
  • purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
  ____________________________________________________________________________________________________
  • proposed method of plant removal: ________________________________________________________________________
  • if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
 v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
  _________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water?  9 Yes 9 No
If Yes:
  i. Total anticipated water usage/demand per day: __________________________ gallons/day
  ii. Will the proposed action obtain water from an existing public water supply?  9 Yes 9 No
If Yes:
  • Name of district or service area: _________________________________________________________________________
  • Does the existing public water supply have capacity to serve the proposal?  9 Yes 9 No
  • Is the project site in the existing district?  9 Yes 9 No
  • Is expansion of the district needed?  9 Yes 9 No
  • Do existing lines serve the project site?  9 Yes 9 No
 iii. Will line extension within an existing district be necessary to supply the project?  9 Yes 9 No
If Yes:
  • Describe extensions or capacity expansions proposed to serve this project: ________________________________________
  ____________________________________________________________________________________________________
  • Source(s) of supply for the district: ________________________________________________________________________
  iv. Is a new water supply district or service area proposed to be formed to serve the project site?  9 Yes 9 No
If, Yes:
  • Applicant/sponsor for new district: ________________________________________________________________________
  • Date application submitted or anticipated: __________________________________________________________________
  • Proposed source(s) of supply for new district: _______________________________________________________________
  v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
  _________________________________________________________________________________________________________
 vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes?  9 Yes 9 No
If Yes:
  i. Total anticipated liquid waste generation per day: _______________ gallons/day
  ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
  approximate volumes or proportions of each): __________________________________________________________________
  _________________________________________________________________________________________________________
  _________________________________________________________________________________________________________
iii. Will the proposed action use any existing public wastewater treatment facilities?  9 Yes 9 No
  If Yes:
  •  Name of wastewater treatment plant to be used: _____________________________________________________________
  •  Name of district: ______________________________________________________________________________________
  •  Does the existing wastewater treatment plant have capacity to serve the project?  9 Yes 9 No
  •  Is the project site in the existing district?  9 Yes 9 No
  •  Is expansion of the district needed?  9 Yes 9 No

  Page 5 of 13

  29