Southtowns Record

Town Board Regular Meeting Agenda, Mar 23, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Mar 23, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Parks and recreation, Budget and taxes, Public safety, Roads and traffic

Original document

Same meeting

Text · page 34 of 79

Read the whole document on one page (all 79 pages, each with its own heading)

c. Is the project site presently used by members of the community for public recreation?  9 Yes 9 No
  i. If Yes: explain: __________________________________________________________________________________________
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed 9 Yes 9 No
  day care centers, or group homes) within 1500 feet of the project site?
If Yes,
  i. Identify Facilities:
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________
e. Does the project site contain an existing dam?  9 Yes 9 No
If Yes:
  i. Dimensions of the dam and impoundment:
  • Dam height:  _________________________________ feet
  • Dam length:  _________________________________ feet
  • Surface area:  _________________________________ acres
  • Volume impounded: _______________________________ gallons OR acre-feet
  ii. Dam=s existing hazard classification: _________________________________________________________________________
  iii. Provide date and summarize results of last inspection:
  _______________________________________________________________________________________________________
  _______________________________________________________________________________________________________
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility,  9 Yes 9 No
  or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
  i. Has the facility been formally closed?  9 Yes 9 No
  • If yes, cite sources/documentation: _______________________________________________________________________
  ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
  _______________________________________________________________________________________________________
  _______________________________________________________________________________________________________
 iii. Describe any development constraints due to the prior solid waste activities: __________________________________________
  _______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin  9 Yes 9 No
  property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
  i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
  _______________________________________________________________________________________________________
  _______________________________________________________________________________________________________
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any  9 Yes 9 No
  remedial actions been conducted at or adjacent to the proposed site?
If Yes:
  i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site  9 Yes 9 No
  Remediation database? Check all that apply:
  9 Yes – Spills Incidents database  Provide DEC ID number(s): ________________________________
  9 Yes – Environmental Site Remediation database  Provide DEC ID number(s): ________________________________
  9 Neither database
ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
  ________________________________________________________________________________________________________
  ________________________________________________________________________________________________________
 iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database?  9 Yes 9 No
If yes, provide DEC ID number(s): ______________________________________________________________________________
iv. If yes to (i), (ii) or (iii) above, describe current status of site(s):
  _______________________________________________________________________________________________________
  _______________________________________________________________________________________________________

  Page 10 of 13

  34